NP

North Peak Solar

Family-owned Minnesota solar installer with top manufacturer certifications and 30-year warranties

Minneapolis, Minnesota
4.9 (20 reviews)
Verified
Residential Commercial

4+

Years in Business

20

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
98%
Certifications
75%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About North Peak Solar

North Peak Solar is a family-owned solar energy company based in Princeton, Minnesota, serving residential and commercial customers across the Twin Cities metro area and greater Minnesota. The company provides tailored solar energy and battery storage solutions, along with EV charging installation. North Peak Solar holds top manufacturer certifications and offers warranties of up to 30 years on its installations.

The company handles every step of the solar process from initial consultation and system design through permitting, installation, and post-installation monitoring. North Peak Solar installs panels from REC and Silfab with Enphase and SolarEdge inverters and offers battery storage from Enphase and Tesla Powerwall. The company holds NABCEP certification and BBB accreditation, reflecting its commitment to industry standards.

North Peak Solar maintains a 4.9-star average rating with customers praising the company’s reliability, clear communication, and professional installation crews. As a newer entrant to the Minnesota solar market, North Peak has quickly built a strong reputation through word-of-mouth referrals and consistent quality. The family-owned structure ensures direct owner involvement and personal accountability on every project.

Service Area

North Peak Solar serves the following areas within a 75-mile radius:

MinneapolisSaint PaulPrincetonElk RiverSt. CloudAnokaBig Lake

Are you North Peak Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
EV Charging
Monitoring

Certifications & Accreditations

NABCEP BBB Accredited

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

EnphaseTesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

20 reviews

Matt S.

5 October 2025
Verified Customer

North Peak Solar installed both solar panels and an EV charger at our home. The experience was professional, reliable, and the communication was excellent throughout. The installation process was seamless.

Julie H.

18 July 2025
Verified Customer

As a family-owned company, North Peak gave us the personal attention we were looking for. They took the time to explain every option and helped us choose the right system size. Very satisfied with the installation and performance.

Brian K.

10 April 2025
Verified Customer

North Peak Solar delivered on every promise. The crew was respectful, efficient, and cleaned up thoroughly after installation. Our system has been producing above estimates and we're already seeing significant savings.

Frequently Asked Questions About North Peak Solar

What services does North Peak Solar offer?

North Peak Solar offers Solar Installation, Battery Storage, Solar Design, EV Charging, Monitoring.

Is North Peak Solar NABCEP certified?

Yes, North Peak Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does North Peak Solar serve?

North Peak Solar serves Minneapolis, Saint Paul, Princeton, Elk River, St. Cloud, Anoka, Big Lake. They are based in Minneapolis with a service radius of 120 km.

What warranty does North Peak Solar offer?

North Peak Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are North Peak Solar's customer reviews?

North Peak Solar has a 4.9/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has North Peak Solar been in business?

North Peak Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from North Peak Solar

Fill in your details and we'll connect you with North Peak Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote