AE

Alps Electrical

Award-winning MCS-accredited solar and battery installer serving York and Teesside

York, UK
5 (250 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

250

Customer Reviews

80 km

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Alps Electrical

Alps Electrical is a family-run solar and electrical contractor based in Kirklevington, Yarm (TS15 9WF), serving York and the wider North Yorkshire and Teesside region. The company is led by Isabella and Andy Pemberton and holds MCS accreditation, NAPIT approval, and RECC membership, ensuring every installation meets the highest industry standards and qualifies customers for the Smart Export Guarantee.

Alps Electrical has received significant industry recognition. At the Checkatrade Awards 2024, the company was named national Sustainability Champion — the highest sustainability award in the UK trade industry. In 2025 they were Highly Commended for the S.A.R.A. Animal Sanctuary solar project and received a Commendation as Regional Solar PV Installer and Contractor of the Year at the Energy Efficiency Awards.

The company offers zero-VAT solar PV and battery storage installations (until 2027), using leading panel and inverter brands. With over 250 ten-out-of-ten Checkatrade reviews, Alps Electrical has one of the strongest customer satisfaction records among solar installers serving the York area. Customers consistently highlight honest advice, clean workmanship, and post-installation support as key differentiators.

Alps Electrical does not have a customer-facing office; surveys and installations are conducted at the customer’s property. Contact is via phone at 01642 790 489 or through their website.

Service Area

Alps Electrical serves the following areas within a 80 km radius:

YorkYarmMiddlesbroughDarlingtonStockton-on-TeesNorthallerton

Are you Alps Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS RECC NAPIT

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

250 reviews

Verified Checkatrade Customer

1 November 2024
Verified Customer

The team delivered exactly what was promised. Professional from survey to sign-off, and the installation was completed efficiently with minimal disruption.

Verified Checkatrade Customer

15 September 2024
Verified Customer

Extremely knowledgeable team who explained every step clearly. The solar and battery system has already made a noticeable difference to our electricity bills.

Frequently Asked Questions About Alps Electrical

What services does Alps Electrical offer?

Alps Electrical offers Solar Installation, Battery Storage, Maintenance.

Is Alps Electrical MCS certified?

Yes, Alps Electrical is MCS certified and also holds RECC, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Alps Electrical serve?

Alps Electrical serves York, Yarm, Middlesbrough, Darlington, Stockton-on-Tees, Northallerton. They are based in York with a service radius of 80 km.

What warranty does Alps Electrical offer?

Alps Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Alps Electrical's customer reviews?

Alps Electrical has a 5/5 rating based on 250 customer reviews. Customers consistently rate them highly.

How long has Alps Electrical been in business?

Alps Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Alps Electrical

Fill in your details and we'll connect you with Alps Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote