IH

IMS Heat Pumps

25+ years of renewable energy expertise installing solar and battery storage across York

York, UK
5 (3 reviews)
Verified
Residential Commercial

29+

Years in Business

0

3

Customer Reviews

80 km

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About IMS Heat Pumps

IMS Heat Pumps was founded in 1997 and has operated as a renewable energy installer for over 25 years. The company primarily serves York, Sheffield, and the surrounding Yorkshire region, installing solar PV, battery storage, and heat pump systems for residential and commercial customers. Battery products offered include Tesla Powerwall 3, GivEnergy, and Fox ESS systems.

The company holds MCS certification and is accredited under the HIES (Home Insulation and Energy Systems Quality Assurance Scheme). IMS Heat Pumps is also a Which? Trusted Trader, a status that requires independent verification of customer service standards, business practices, and technical competency.

With deep familiarity with York’s diverse housing stock — from Victorian terraces in Clifton to newer developments in Osbaldwick — IMS designs each solar and battery system to the specific requirements of the property rather than applying standard specifications. This bespoke approach is reflected in customer feedback, which highlights technical knowledge and attention to detail as key strengths.

IMS Heat Pumps can be reached by phone on 0114 327 0100 or through the contact form on their website at imsheatpumps.co.uk. For York homeowners looking for an experienced, independently-verified renewable energy contractor with a long track record across Yorkshire, IMS Heat Pumps is a strong candidate for consideration.

Service Area

IMS Heat Pumps serves the following areas within a 80 km radius:

YorkPoppletonHuntingtonEarswickSheffieldHarrogate

Are you IMS Heat Pumps?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS HIES

Partner Manufacturers

Batteries

Tesla PowerwallGivEnergyFox ESS

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About IMS Heat Pumps

What services does IMS Heat Pumps offer?

IMS Heat Pumps offers Solar Installation, Battery Storage, Maintenance.

Is IMS Heat Pumps MCS certified?

Yes, IMS Heat Pumps is MCS certified and also holds HIES certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does IMS Heat Pumps serve?

IMS Heat Pumps serves York, Poppleton, Huntington, Earswick, Sheffield, Harrogate. They are based in York with a service radius of 80 km.

What warranty does IMS Heat Pumps offer?

IMS Heat Pumps offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are IMS Heat Pumps's customer reviews?

IMS Heat Pumps has a 5/5 rating based on 3 customer reviews. Customers consistently rate them highly.

How long has IMS Heat Pumps been in business?

IMS Heat Pumps was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from IMS Heat Pumps

Fill in your details and we'll connect you with IMS Heat Pumps.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote