AS

American Solar Energy Systems

Jacksonville's established solar contractor specializing in PV, pool heating, and water heating systems since 1979

Jacksonville, Florida
4.5 (20 reviews)
Verified
Residential Commercial

47+

Years in Business

0

20

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About American Solar Energy Systems

American Solar Energy Systems is one of the longest-operating solar contractors in the Jacksonville area, established in 1979. The company operates from 4364 Sycamore Pass Court West in Jacksonville and provides solar photovoltaic panel installations, solar pool heating, and solar domestic water heating systems for residential and commercial clients throughout Northeast Florida.

The company holds a Florida licensed solar contractor certification and is BBB Accredited. With over four decades in the solar industry, American Solar brings deep expertise in local building codes, utility interconnection requirements, and site assessment. The company installs Qcells panels with Enphase microinverters and Enphase IQ battery storage, handling system design, permitting, installation, and utility coordination.

American Solar Energy Systems maintains a steady customer base built on decades of reliable service and straightforward pricing. Customers note the company’s no-pressure approach and practical recommendations based on actual energy usage patterns. The company serves Jacksonville, St. Augustine, Orange Park, Jacksonville Beach, Ponte Vedra Beach, and surrounding communities. Business hours are Monday through Friday, 8 AM to 5 PM.

Service Area

American Solar Energy Systems serves the following areas within a 62-mile radius:

JacksonvilleSt. AugustineOrange ParkJacksonville BeachPonte Vedra BeachFleming Island

Are you American Solar Energy Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
Grid Connection

Certifications & Accreditations

BBB Accredited FL Licensed Solar Contractor

Partner Manufacturers

Panels

Qcells

Inverters

Enphase

Batteries

Enphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

20 reviews

William F.

25 August 2025
Verified Customer

American Solar has decades of experience and it shows. The installation was professional and the system has been performing reliably since day one. Their knowledge of local utility requirements streamlined the permitting process.

Barbara J.

10 May 2025
Verified Customer

We appreciated the honest assessment of our energy needs and roof suitability. No high-pressure sales tactics, just straightforward recommendations. The system was installed efficiently and cleanly.

Kevin R.

18 February 2025
Verified Customer

Long-standing local company with a solid reputation. The solar PV installation went smoothly and the team was knowledgeable. Good value for the quality of equipment and workmanship provided.

Frequently Asked Questions About American Solar Energy Systems

What services does American Solar Energy Systems offer?

American Solar Energy Systems offers Solar Installation, Solar Design, Maintenance, Grid Connection.

Is American Solar Energy Systems NABCEP certified?

American Solar Energy Systems holds the following certifications: BBB Accredited, FL Licensed Solar Contractor. Contact them directly for the latest accreditation details.

What areas does American Solar Energy Systems serve?

American Solar Energy Systems serves Jacksonville, St. Augustine, Orange Park, Jacksonville Beach, Ponte Vedra Beach, Fleming Island. They are based in Jacksonville with a service radius of 100 km.

What warranty does American Solar Energy Systems offer?

American Solar Energy Systems offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are American Solar Energy Systems's customer reviews?

American Solar Energy Systems has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has American Solar Energy Systems been in business?

American Solar Energy Systems was founded in 1979 and has been in business for 47 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from American Solar Energy Systems

Fill in your details and we'll connect you with American Solar Energy Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote