AS

Aneva Solar

NABCEP-certified Scottsdale solar installer since 2013 with 80+ five-star reviews and premium equipment from Enphase and REC

Scottsdale, Arizona
4.8 (80 reviews)
Verified
Residential Commercial

13+

Years in Business

80

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Aneva Solar

Aneva Solar is a NABCEP-certified solar energy company established in 2013, with offices at 9393 N 90th Street, Suite 102/353 in Scottsdale, Arizona, and 747 W Pinnacle Peak Road, Suite A104 in Phoenix. The company provides residential and commercial solar installation services across the Phoenix metropolitan area and beyond, including Payson and New River.

Aneva Solar holds NABCEP certification, Tile Roofing Institute certification, and OSHA certification. The company is fully insured and bonded with General Liability, Umbrella, and Workers Compensation coverage. Aneva Solar installs premium equipment including Meyer Burger, REC, and Hyundai Solar panels paired with Enphase microinverters. A project manager is present on site during every installation.

The company has earned over 80 five-star reviews across Google, Yelp, BBB, Angi, Facebook, and HomeAdvisor, maintaining a 4.8-star overall rating. Aneva Solar is BBB-accredited and serves Scottsdale, Phoenix, Paradise Valley, Tempe, Mesa, Chandler, and surrounding Arizona communities. Business hours are Monday through Friday, 9 AM to 5 PM.

Service Area

Aneva Solar serves the following areas within a 62-mile radius:

ScottsdalePhoenixParadise ValleyTempeMesaChandlerPaysonNew River

Are you Aneva Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
Energy Audit

Certifications & Accreditations

NABCEP Tile Roofing Institute Certified OSHA Certified

Partner Manufacturers

Panels

Meyer BurgerRECHyundai Solar

Inverters

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

80 reviews

Susan H.

25 August 2025
Verified Customer

Aneva Solar made the entire process easy. The project manager was on site during installation and made sure everything was done right. Our electricity bills have dropped dramatically since going solar.

Robert D.

18 May 2025
Verified Customer

Did extensive research before choosing Aneva Solar. Their NABCEP certification and tile roof experience set them apart. The crew was careful with our tile roof and the system looks clean and professional.

Nancy W.

5 February 2025
Verified Customer

Five stars all around. From the initial consultation to the final walkthrough, Aneva Solar delivered on every promise. The REC panels and Enphase inverters are performing exactly as projected.

Frequently Asked Questions About Aneva Solar

What services does Aneva Solar offer?

Aneva Solar offers Solar Installation, Solar Design, Maintenance, Energy Audit.

Is Aneva Solar NABCEP certified?

Yes, Aneva Solar is NABCEP certified and also holds Tile Roofing Institute Certified, OSHA Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Aneva Solar serve?

Aneva Solar serves Scottsdale, Phoenix, Paradise Valley, Tempe, Mesa, Chandler, Payson, New River. They are based in Scottsdale with a service radius of 100 km.

What warranty does Aneva Solar offer?

Aneva Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Aneva Solar's customer reviews?

Aneva Solar has a 4.8/5 rating based on 80 customer reviews. Customers consistently rate them highly.

How long has Aneva Solar been in business?

Aneva Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Aneva Solar

Fill in your details and we'll connect you with Aneva Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote