AP

ANT Power

Veteran-owned Tacoma electrical and solar contractor specializing in residential and commercial installations

Tacoma, Washington
5 (5 reviews)
Verified
Residential Commercial

3+

Years in Business

0

5

Customer Reviews

37 mi

Service Area

1-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
100%
Certifications
75%
Experience
50%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About ANT Power

ANT Power is a veteran-owned and minority-owned electrical and solar contractor headquartered at 4016 S Park Ave, Tacoma, WA 98418. Founded in 2023, the company provides residential and commercial solar installation, battery storage, EV charger installation, generator systems, and general electrical services throughout the Tacoma area.

The company holds BBB accreditation with an A+ rating and is certified by Franklin, SPAN, and Generac for battery and smart panel installations. ANT Power handles all work in-house, from system design through permitting and final inspection.

ANT Power operates Monday through Friday, 9:00 AM to 5:00 PM, and serves customers across Pierce County and the South Puget Sound region.

Service Area

ANT Power serves the following areas within a 37-mile radius:

TacomaLakewoodPuyallupFederal WayUniversity Place

Are you ANT Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

BBB A+ Rated BBB Accredited

Partner Manufacturers

Batteries

FranklinGenerac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

5 reviews

Verified Customer

1 September 2025
Verified Customer

ANT Power did an excellent job installing our solar panels and EV charger. As a veteran-owned business, they bring discipline and attention to detail to every project. Highly recommend.

Verified Customer

15 July 2025
Verified Customer

Professional and reliable. The team completed our solar installation ahead of schedule and the system is performing great. Fair pricing and excellent communication throughout.

Verified Customer

20 May 2025
Verified Customer

Great experience with ANT Power. They handled everything from design to inspection and were very responsive to our questions. The installation looks clean and professional.

Frequently Asked Questions About ANT Power

What services does ANT Power offer?

ANT Power offers Solar Installation, Battery Storage, EV Charging.

Is ANT Power NABCEP certified?

ANT Power holds the following certifications: BBB A+ Rated, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does ANT Power serve?

ANT Power serves Tacoma, Lakewood, Puyallup, Federal Way, University Place. They are based in Tacoma with a service radius of 60 km.

What warranty does ANT Power offer?

ANT Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are ANT Power's customer reviews?

ANT Power has a 5/5 rating based on 5 customer reviews. Customers consistently rate them highly.

How long has ANT Power been in business?

ANT Power was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from ANT Power

Fill in your details and we'll connect you with ANT Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote