Sun's Eye Solar
Tacoma's longest-running solar installer, designing and installing residential and commercial systems since 1992
34+
Years in Business
22
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Sun's Eye Solar
Sun’s Eye Solar is a Tacoma-based solar installation company founded in 1992 and headquartered at 5249 S Puget Sound Ave, Tacoma, WA 98409. With over 30 years of experience, the company is one of the longest-operating solar installers in the South Sound region, serving residential and commercial customers throughout Pierce County and the greater Puget Sound area.
The company is a certified installer for Tesla Powerwall, Enphase microinverters, Franklin batteries, and SPAN smart panels. Sun’s Eye Solar also installs EV chargers and provides ongoing maintenance services. On EnergySage, the company holds Elite Installer status with a 5.0-star rating from 22 reviews. Customers consistently praise the company’s technical expertise and no-pressure consultations.
Sun’s Eye Solar operates Monday through Friday, 9:00 AM to 5:00 PM, and provides free site assessments for homeowners and businesses interested in going solar in the Tacoma area.
Service Area
Sun's Eye Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sun's Eye Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
22 reviews
Verified Customer
Sun's Eye Solar provided an excellent experience from start to finish. Their team was knowledgeable, professional, and completed the installation quickly. System has been performing above expectations.
Verified Customer
Great local company with over 30 years of experience. They handled everything from permitting to final inspection. The crew was respectful of our property and left everything clean.
Verified Customer
Outstanding service and quality installation. The design team maximized our roof space and the system is generating more power than estimated. Highly recommend.
Frequently Asked Questions About Sun's Eye Solar
What services does Sun's Eye Solar offer?
Sun's Eye Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Sun's Eye Solar NABCEP certified?
Sun's Eye Solar holds the following certifications: Tesla Certified Installer, Enphase Certified. Contact them directly for the latest accreditation details.
What areas does Sun's Eye Solar serve?
Sun's Eye Solar serves Tacoma, Lakewood, Puyallup, University Place, Gig Harbor, Olympia. They are based in Tacoma with a service radius of 80 km.
What warranty does Sun's Eye Solar offer?
Sun's Eye Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sun's Eye Solar's customer reviews?
Sun's Eye Solar has a 5/5 rating based on 22 customer reviews. Customers consistently rate them highly.
How long has Sun's Eye Solar been in business?
Sun's Eye Solar was founded in 1992 and has been in business for 34 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tacoma
Get a Free Solar Quote from Sun's Eye Solar
Fill in your details and we'll connect you with Sun's Eye Solar.
Quote request sent!
Sun's Eye Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile