AS

APG Solar

Family-run Atwater solar company serving Stockton and the Central Valley with residential, commercial, and agricultural systems

Stockton, California
4.8 (16 reviews)
Verified
Residential Commercial

14+

Years in Business

0

16

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About APG Solar

APG Solar is a family-run solar installation company based at 2750 Spaceport Entry in Atwater, California, serving Stockton and the greater Central Valley region. The company provides solutions for homes, businesses, off-grid well meters, agricultural meters, battery backup systems, generator backups, and patio covers with integrated solar panels.

APG Solar specializes in residential, commercial, and agricultural solar installations throughout the Central Valley. The company handles system design, installation, maintenance, repairs, and financing assistance, with particular expertise in agricultural solar applications for the farming communities of the San Joaquin Valley.

The company maintains BBB accreditation and has earned strong reviews on Yelp with 16 reviews. APG Solar serves Stockton, Atwater, Merced, Modesto, Turlock, and surrounding Central Valley communities.

Service Area

APG Solar serves the following areas within a 62-mile radius:

StocktonAtwaterMercedModestoTurlockLos Banos

Are you APG Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Solar Design

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

16 reviews

Carl T.

28 July 2025
Verified Customer

APG Solar designed a system for our farm that handles both our residential and agricultural power needs. A true family business that understands Central Valley farming.

Donna R.

15 April 2025
Verified Customer

Great local company that provides honest assessments and quality installations. They handle battery backup systems and generator integration too.

Steven M.

20 January 2025
Verified Customer

APG Solar installed our residential system and the quality is excellent. They also built us a patio cover with integrated solar panels. Creative solution.

Frequently Asked Questions About APG Solar

What services does APG Solar offer?

APG Solar offers Solar Installation, Battery Storage, Maintenance, Solar Design.

Is APG Solar NABCEP certified?

APG Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does APG Solar serve?

APG Solar serves Stockton, Atwater, Merced, Modesto, Turlock, Los Banos. They are based in Stockton with a service radius of 100 km.

What warranty does APG Solar offer?

APG Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are APG Solar's customer reviews?

APG Solar has a 4.8/5 rating based on 16 customer reviews. Customers consistently rate them highly.

How long has APG Solar been in business?

APG Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from APG Solar

Fill in your details and we'll connect you with APG Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote