Superior Solar Inc
SunPower certified dealer in Roseville specializing in residential, commercial, and agricultural solar across the Central Valley
16+
Years in Business
41
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Superior Solar Inc
Superior Solar Inc is a renewable energy company headquartered at 1100 Melody Lane, Suite 1006, in Roseville, California, serving Stockton and the greater Central Valley and Sacramento regions. The company specializes in residential, commercial, and agricultural solar installations as a SunPower Certified Dealer.
Superior Solar provides consultation and solar panel installations using SunPower equipment, which offers some of the highest efficiency ratings in the industry. The company handles agricultural solar projects in addition to standard residential and commercial installations, serving the farming communities throughout the Central Valley.
The company has earned a 5.0-star rating on EcoWatch and maintains BBB accreditation. Superior Solar serves a wide service area across the Sacramento Valley and Central Valley including Stockton, Roseville, Sacramento, Lodi, and Elk Grove.
Service Area
Superior Solar Inc serves the following areas within a 62-mile radius:
Contact Information
Are you Superior Solar Inc?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
41 reviews
James H.
Superior Solar installed SunPower panels on our Stockton property. The system quality is outstanding and the team was professional from consultation to activation.
Maria C.
We chose Superior Solar for their SunPower certification and agricultural solar expertise. They designed a system for our farm that has exceeded production estimates.
Robert W.
Excellent company with a focus on quality. The SunPower panels they installed are among the most efficient on the market. Great customer service throughout.
Frequently Asked Questions About Superior Solar Inc
What services does Superior Solar Inc offer?
Superior Solar Inc offers Solar Installation, Solar Design.
Is Superior Solar Inc NABCEP certified?
Superior Solar Inc holds the following certifications: SunPower Certified Dealer, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Superior Solar Inc serve?
Superior Solar Inc serves Stockton, Roseville, Sacramento, Lodi, Elk Grove, Rancho Cordova. They are based in Stockton with a service radius of 100 km.
What warranty does Superior Solar Inc offer?
Superior Solar Inc offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Superior Solar Inc's customer reviews?
Superior Solar Inc has a 5/5 rating based on 41 customer reviews. Customers consistently rate them highly.
How long has Superior Solar Inc been in business?
Superior Solar Inc was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Stockton
Get a Free Solar Quote from Superior Solar Inc
Fill in your details and we'll connect you with Superior Solar Inc.
Quote request sent!
Superior Solar Inc will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile