AE

Apollo Energy

Colorado's only majority female-owned solar company, B Corporation certified, serving the Front Range since 2015

Fort Collins, Colorado
4.8 (34 reviews)
Verified
Residential Commercial

11+

Years in Business

0

34

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9.1 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Apollo Energy

Apollo Energy is a Colorado-based, woman-owned and operated solar installation company serving the Front Range from Fort Collins to Colorado Springs. Founded in 2015, the company is Denver’s first solar Certified B Corporation and Colorado’s only majority female-owned solar company. Apollo Energy is a Fort Collins Utilities-approved third-party solar contractor.

The company installs SolarEdge inverters and optimizers and provides consultation, custom system design, financing assistance, in-house solar and battery installation, removal and reinstallation, and ongoing solar system maintenance. All installations are completed by Apollo Energy’s in-house electricians and installation team, with no subcontracting.

Apollo Energy offers a 25- to 30-year solar panel performance warranty, 25-year panel workmanship warranty, and 25-year SolarEdge inverter and optimizer extended warranties. The company maintains a 4.8-star rating on Yelp from 34 reviews, with customers praising the team’s professionalism and commitment to quality.

Service Area

Apollo Energy serves the following areas within a 124-mile radius:

Fort CollinsDenverBoulderLovelandGreeleyColorado Springs

Are you Apollo Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Certifications & Accreditations

B Corporation SolarEdge Certified Installer Colorado Contractor License

Partner Manufacturers

Inverters

SolarEdge

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

34 reviews

Rachel N.

18 October 2025
Verified Customer

Apollo Energy made the transition to solar simple and affordable. Their in-house team handled everything from design to installation. Great company to work with.

James C.

2 August 2025
Verified Customer

Woman-owned and B Corp certified. These values matter to us and the quality of work matched. System is producing exactly as promised.

Patricia F.

25 May 2025
Verified Customer

Good experience overall. The consultation was thorough and the installation team was professional. Took slightly longer than expected for permitting but Apollo kept us informed.

Frequently Asked Questions About Apollo Energy

What services does Apollo Energy offer?

Apollo Energy offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Apollo Energy NABCEP certified?

Apollo Energy holds the following certifications: B Corporation, SolarEdge Certified Installer, Colorado Contractor License. Contact them directly for the latest accreditation details.

What areas does Apollo Energy serve?

Apollo Energy serves Fort Collins, Denver, Boulder, Loveland, Greeley, Colorado Springs. They are based in Fort Collins with a service radius of 200 km.

What warranty does Apollo Energy offer?

Apollo Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Apollo Energy's customer reviews?

Apollo Energy has a 4.8/5 rating based on 34 customer reviews. Customers consistently rate them highly.

How long has Apollo Energy been in business?

Apollo Energy was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Apollo Energy

Fill in your details and we'll connect you with Apollo Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote