Solar Installers in Fort Collins, Colorado

10 Companies 872 Reviews 4.7 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Fort Collins

Ranked by rating and customer reviews

NE
1

Next Energy Solar

Verified
5.0 (15 reviews)
Est. 2020 · Fort Collins, Colorado · 25yr warranty
SolarBatteryDesignGrid Connection

Fort Collins Utilities Approved Contractor · Colorado Contractor License

NS
2

Namaste Solar

Verified
4.9 (500 reviews)
Est. 2005 · Fort Collins, Colorado · 25yr warranty
SolarBatteryEV ChargingDesign

NABCEP · B Corporation · Colorado Contractor License

SS
3

Sandbox Solar

Verified
4.9 (156 reviews)
Est. 2015 · Fort Collins, Colorado · 25yr warranty
SolarBatteryEV ChargingDesign

BBB Accredited · Colorado Contractor License

REC + Enphase

SP
4

Solar Pathways

Verified
4.9 (25 reviews)
Est. 2021 · Fort Collins, Colorado · 25yr warranty
SolarBatteryEV ChargingDesign

Colorado Contractor License

AE
5

Alt E Wind & Solar

Verified
4.8 (30 reviews)
Est. 2010 · Fort Collins, Colorado · 25yr warranty
SolarBatteryDesignEnergy Audit

NABCEP · BBB A+ Rating · Colorado Contractor License

Mission Solar + Enphase

AE
6

Apollo Energy

Verified
4.8 (34 reviews)
Est. 2015 · Fort Collins, Colorado · 25yr warranty
SolarBatteryDesignMaintenance

B Corporation · SolarEdge Certified Installer · Colorado Contractor License

SolarEdge

CS
7

Colorado Solar Co

Verified
4.8 (10 reviews)
Est. 2023 · Fort Collins, Colorado · 25yr warranty
SolarDesignGrid Connection

Colorado Contractor License

PB
8

Photon Brothers

Verified
4.7 (63 reviews)
Est. 2016 · Fort Collins, Colorado · 25yr warranty
SolarBatteryEV ChargingDesign

Tesla Powerwall Certified Installer · BBB Accredited · Colorado Contractor License

S
9

Solargize

Verified
4.5 (18 reviews)
Est. 2020 · Fort Collins, Colorado · 25yr warranty
SolarBatteryDesignMaintenance

Colorado Contractor License

BR
10

Blue Raven Solar

Verified
4.0 (21 reviews)
Est. 2014 · Fort Collins, Colorado · 25yr warranty
SolarBatteryDesignGrid Connection

BBB A+ Rating · Colorado Electrical Contractor License

Maxeon + Enphase

What Solar Costs in Fort Collins

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

872

Customer Reviews

Solar Installation in Fort Collins, Colorado

Fort Collins homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Fort Collins

Start by checking NABCEP certification and Colorado state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Fort Collins.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Colorado

Find solar installers in other Colorado cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Fort Collins?

Solar panel costs in Fort Collins typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Colorado state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Fort Collins?

The best solar installer in Fort Collins depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Fort Collins?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Colorado may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility — check with your local utility in Fort Collins to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Fort Collins?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Fort Collins?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free