Applegarth Engineering
MCS-certified Wirral and Liverpool solar PV, battery storage, and EV charger installer with professional local service
16+
Years in Business
17
Customer Reviews
50 km
Service Area
SurgePV Score
About Applegarth Engineering
Applegarth Engineering is a Wirral-based renewable energy installer located at 43 Allerton Road, Birkenhead, CH42 5LN. The company specialises in solar PV panel installation, battery storage systems, and EV charge point fitting for residential and commercial clients across the Wirral, Liverpool, Chester, and Manchester.
Applegarth is fully MCS accredited for solar panel installations, which means customers qualify for the Smart Export Guarantee and government incentives. The company has a 4-star rating on Trustpilot and positive testimonials from clients across Merseyside. Their team, led by Peter, handles projects ranging from domestic rooftop systems to ground-mounted solar arrays and farm installations.
Customers praise the team for their punctuality, friendly approach, tidy workmanship, and willingness to answer questions throughout the process. Applegarth provides full design, installation, and aftercare services, and is known for working in all weather conditions to complete projects on schedule.
Service Area
Applegarth Engineering serves the following areas within a 50 km radius:
Contact Information
Are you Applegarth Engineering?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
2 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4
17 reviews
Verified Customer
Applegarth installed a roof mounted solar panel system at my home in Liverpool. The installation team were punctual, friendly and tidy. Before they left they answered all of my questions and explained how they system worked clearly. Overall I am very pleased and would recommend this company to anyone.
Verified Customer
I recently had a solar panel and battery storage system installed at my farm, with the aim of reducing the farms electricity bills. Peter and his team did a great job fitting the system. I would have no reservations recommending Applegarth.
Verified Customer
Peter and his team were all polite, pleasant, helpful and very hard working. They worked through wind, rain and snow and remained cheerful and humoured in spite of everything. We are over the moon with our new solar panel system and we are looking forward to being less reliant on the grid.
Frequently Asked Questions About Applegarth Engineering
What services does Applegarth Engineering offer?
Applegarth Engineering offers Solar Installation, Battery Storage, EV Charging.
Is Applegarth Engineering MCS certified?
Yes, Applegarth Engineering is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Applegarth Engineering serve?
Applegarth Engineering serves Liverpool, Wirral, Birkenhead, Chester, Manchester. They are based in Liverpool with a service radius of 50 km.
What warranty does Applegarth Engineering offer?
Applegarth Engineering offers 25-year panel warranty, 10-year inverter warranty, and 2-year installation/workmanship warranty.
How are Applegarth Engineering's customer reviews?
Applegarth Engineering has a 4/5 rating based on 17 customer reviews. They are well-regarded by their customers.
How long has Applegarth Engineering been in business?
Applegarth Engineering was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Liverpool
Get a Free Solar Quote from Applegarth Engineering
Fill in your details and we'll connect you with Applegarth Engineering.
Quote request sent!
Applegarth Engineering will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile