Solar Installers in Liverpool, UK

10 Companies 527 Reviews 4.6 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Liverpool

Ranked by rating and customer reviews

AR
1

ACC Renewable Energy

Verified
5.0 (112 reviews)
Est. 2020 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark · OZEV

EE
2

Eleck Energy

Verified
5.0 (25 reviews)
Est. 2023 · Liverpool · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS

GR
3

Greentech Renewables

Verified
5.0 (112 reviews)
Est. 2020 · Liverpool · 25yr warranty
SolarBattery

MCS · NAPIT · HIES · TrustMark

EE
4

E-Verve Energy

Verified
4.8 (64 reviews)
Est. 2018 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC · OZEV

EW
5

Eco Warrior Solar

Verified
4.8 (24 reviews)
Est. 2025 · Liverpool · 25yr warranty
SolarBattery

MCS

FI
6

Feed it Green

Verified
4.8 (52 reviews)
Est. 2011 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · OLEV · WPS · CHAS

NS
7

Northern Solar

Verified
4.6 (28 reviews)
Est. 2006 · Liverpool · 25yr warranty
SolarBatteryMaintenance

MCS

AE
8

Applegarth Engineering

Verified
4.0 (17 reviews)
Est. 2010 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS

CZ
9

Carbon Zero Renewables

Verified
4.0 (65 reviews)
Est. 2009 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark · NAPIT

CE
10

Conscious Energy

Verified
4.0 (28 reviews)
Est. 2019 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · HIES · TrustMark

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score. Companies are ranked by this score, with featured installers shown first.

Customer Reviews

We aggregate ratings from Google, Trustpilot, and Checkatrade. Only companies with 4.0+ ratings and verified reviews are listed.

Certifications

MCS certification is the UK standard. We also check for RECC, TrustMark, NAPIT, NICEIC, and ISO 9001 accreditations.

Track Record

Years in business, projects completed, warranty coverage, and service range contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking — placement is based on verified data only.

10

Verified Companies

527

Customer Reviews

Solar Installation in Liverpool

Liverpool offers strong potential for solar energy generation. UK solar irradiance levels, combined with falling panel costs and the Smart Export Guarantee, make solar a sound investment for homeowners and businesses across the city. A typical 4kW system generates between 3,400-4,200 kWh per year depending on roof orientation, pitch, and shading. South-facing roofs with a 30-35 degree pitch deliver the best performance.

When choosing a solar installer in Liverpool, look for MCS certification as a baseline requirement. This ensures the installation meets industry standards and qualifies you for the Smart Export Guarantee. Check installer reviews, ask for references from local projects, and compare at least three quotes before committing. Many installers in Liverpool also offer battery storage and EV charging solutions, allowing you to maximise your solar investment.

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the UK. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation in Liverpool: Step by Step

1

Free Consultation

Contact an installer for a free site survey. They'll assess your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, expected generation, costs, and projected savings.

3

Installation

Scaffolding goes up, panels and inverter are installed. Most residential systems take 1-3 days.

4

Inspection

Building control sign-off, DNO notification, and MCS certificate issued for SEG eligibility.

5

Go Live

System is commissioned, monitoring is set up, and you start generating clean energy and saving money.

Frequently Asked Questions

How much do solar panels cost in Liverpool?

Solar panel costs in Liverpool are in line with UK averages. A 4kW residential system typically costs between £5,000 and £8,000 including installation. Prices may vary based on roof type, access, and the specific panels and inverter chosen. Get quotes from multiple MCS-certified installers in Liverpool to compare.

Who is the best solar installer in Liverpool?

The best solar installer in Liverpool depends on your specific needs, budget, and project type. Check installer ratings, reviews, certifications (especially MCS), and years of experience on this page. We recommend getting quotes from at least three installers to compare pricing and service.

How long does a solar panel installation take?

A standard residential solar installation takes 1-3 days for the physical installation work. However, the full process from initial survey to commissioning typically takes 4-8 weeks, including site assessment, design, scaffolding, installation, electrical connection, and DNO notification.

Do I need planning permission for solar panels in the UK?

Most residential solar installations in the UK fall under permitted development and do not require planning permission, provided the panels do not protrude more than 200mm from the roof surface and are not installed on a listed building or in a conservation area. Commercial installations and ground-mounted systems may require planning approval.

Are You a Solar Installer in Liverpool?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free