AC

Arizona Custom Solar

Scottsdale-based solar installer with 2,400+ completed installations offering custom residential and commercial solar solutions

Scottsdale, Arizona
4.8 (59 reviews)
Verified
Residential Commercial

8+

Years in Business

2,400+

Projects Completed

59

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.2 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Arizona Custom Solar

Arizona Custom Solar is a solar energy company located at 9420 East Doubletree Ranch Road, Suite C110, in Scottsdale, Arizona. The company has completed over 2,400 residential and commercial solar installations across the Phoenix metropolitan area, offering custom solar panel systems, battery storage solutions, system upgrades and expansion, and solar consultation services.

The company is owned by Erik Nockleby and holds a Specialty Dual license (ROC# 359170) with the Arizona Registrar of Contractors. Arizona Custom Solar handles all aspects of the solar process including permitting, paperwork, and interconnection. The company serves Scottsdale, Phoenix, Paradise Valley, Tempe, Mesa, Chandler, and surrounding communities.

Arizona Custom Solar maintains a 4.8-star rating from 59 Google reviews, with customers consistently praising the company’s clear pricing, patient consultation process, and professional installations. The company is known for its no-pressure approach and transparent financing assistance.

Service Area

Arizona Custom Solar serves the following areas within a 50-mile radius:

ScottsdalePhoenixParadise ValleyTempeMesaChandler

Are you Arizona Custom Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Certifications & Accreditations

ROC Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

59 reviews

Dave M.

8 September 2025
Verified Customer

Erik at Arizona Custom Solar was extremely patient and knowledgeable. He walked us through every option and helped design a system perfect for our Scottsdale home. No pressure, just honest advice.

Cynthia R.

20 June 2025
Verified Customer

From the initial consultation to the final inspection, everything was handled professionally. The crew was respectful of our property and the system has been performing above expectations.

John A.

12 March 2025
Verified Customer

Compared multiple quotes and Arizona Custom Solar offered the best value. Clear pricing with no hidden fees. The installation was completed on time and the system looks great on our roof.

Frequently Asked Questions About Arizona Custom Solar

What services does Arizona Custom Solar offer?

Arizona Custom Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Arizona Custom Solar NABCEP certified?

Arizona Custom Solar holds the following certifications: ROC Licensed. Contact them directly for the latest accreditation details.

What areas does Arizona Custom Solar serve?

Arizona Custom Solar serves Scottsdale, Phoenix, Paradise Valley, Tempe, Mesa, Chandler. They are based in Scottsdale with a service radius of 80 km.

What warranty does Arizona Custom Solar offer?

Arizona Custom Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Arizona Custom Solar's customer reviews?

Arizona Custom Solar has a 4.8/5 rating based on 59 customer reviews. Customers consistently rate them highly.

How long has Arizona Custom Solar been in business?

Arizona Custom Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Arizona Custom Solar

Fill in your details and we'll connect you with Arizona Custom Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote