AS

Astrawatt Solar

Inc. 5000 solar company headquartered in Kansas City, serving residential customers across multiple states with trusted local teams

Kansas City, Missouri
4.6 (120 reviews)
Verified
Residential

8+

Years in Business

0

120

Customer Reviews

124 mi

Service Area

51-200

Employees

SurgePV Score

8.8 / 10
Customer Reviews
92%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Astrawatt Solar

Astrawatt Solar is a solar installation company headquartered in Kansas City, Missouri, at 3525 Roanoke Road, Suite 110. The company was recognized as an Inc. 5000 honoree for its rapid growth and serves residential customers across multiple markets including Kansas City, St. Louis, and locations in several other states. Astrawatt Solar is BBB-accredited and maintains local installation teams in each market it serves.

The company provides end-to-end residential solar services including site assessment, system design, permitting, installation, and utility interconnection. Battery storage options are available for customers who want backup power capability. Astrawatt Solar uses quality equipment backed by manufacturer warranties and provides monitoring tools so customers can track their system’s production in real time.

Astrawatt Solar serves homeowners across the Kansas City metro area on both the Missouri and Kansas sides, as well as communities extending into St. Louis and beyond. The company offers free solar consultations and works with customers to evaluate financing options. Business hours are Monday through Saturday, 7 AM to 7 PM, making it accessible for homeowners with weekday schedules.

Service Area

Astrawatt Solar serves the following areas within a 124-mile radius:

Kansas CitySt. LouisIndependenceLee's SummitOverland ParkOlatheTopeka

Are you Astrawatt Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring

Certifications & Accreditations

BBB Accredited Inc. 5000 Honoree

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

120 reviews

Craig P.

22 September 2025
Verified Customer

Astrawatt handled our Kansas City installation efficiently. The local team was knowledgeable and the installation was completed in one day. Our system has been producing consistently and the monitoring app works well.

Holly S.

30 June 2025
Verified Customer

We appreciated that Astrawatt is headquartered right here in KC. The consultation was thorough and they designed a system that fits our roof perfectly. Our electric bill dropped from $230 to under $40 in the first full month.

Dave N.

14 March 2025
Verified Customer

Good solar company with a professional team. The installation went smoothly and the system is performing as expected. The only reason for four stars is a brief communication gap during the permitting phase, but the end result was solid.

Frequently Asked Questions About Astrawatt Solar

What services does Astrawatt Solar offer?

Astrawatt Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.

Is Astrawatt Solar NABCEP certified?

Astrawatt Solar holds the following certifications: BBB Accredited, Inc. 5000 Honoree. Contact them directly for the latest accreditation details.

What areas does Astrawatt Solar serve?

Astrawatt Solar serves Kansas City, St. Louis, Independence, Lee's Summit, Overland Park, Olathe, Topeka. They are based in Kansas City with a service radius of 200 km.

What warranty does Astrawatt Solar offer?

Astrawatt Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Astrawatt Solar's customer reviews?

Astrawatt Solar has a 4.6/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has Astrawatt Solar been in business?

Astrawatt Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Astrawatt Solar

Fill in your details and we'll connect you with Astrawatt Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote