BS

Barrett Solar

Locally owned Kansas City solar company since 2019, specializing in residential and commercial installations across Missouri and Kansas

Kansas City, Missouri
4.8 (100 reviews)
Verified
Residential Commercial

7+

Years in Business

0

100

Customer Reviews

99 mi

Service Area

11-50

Employees

SurgePV Score

8.2 / 10
Customer Reviews
96%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Barrett Solar

Barrett Solar is a locally owned solar installation company based in Kansas City, Missouri, founded in 2019 by Tyler Blanchard. Blanchard brings a background in renewable energy and project management, having previously served as a QA and Project Management Lead at Siemens Gamesa Renewable Energy and as an Alternative Energy Professor at Pinnacle Career Institute. Barrett Solar handles residential and commercial solar projects across Missouri and Kansas.

The company manages every aspect of the solar installation process in-house, including sales, engineering, permitting, installation, and ongoing customer support. Barrett Solar uses high-quality panels and micro-inverters backed by 25-year manufacturer warranties. The company emphasizes competitive pricing and transparent communication throughout the project timeline, from initial consultation to final utility inspection.

Barrett Solar operates from offices in Kansas City and Lee’s Summit, serving the entire KC metro area and extending into eastern Kansas. The company provides free solar consultations, detailed production estimates, and guidance on available financing options. Walk-in consultations are welcome during business hours, Monday through Saturday.

Service Area

Barrett Solar serves the following areas within a 99-mile radius:

Kansas CityLee's SummitIndependenceBlue SpringsLibertyOverland ParkOlatheLawrence

Are you Barrett Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Energy Audit
Grid Connection
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

100 reviews

Tyler M.

1 October 2025
Verified Customer

Barrett Solar handled our installation from start to finish with no issues. The team was on time, professional, and kept the worksite clean. Our 9 kW system is producing more than the estimate. Highly recommend this local company.

Samantha R.

12 July 2025
Verified Customer

We chose Barrett Solar after getting four quotes. They offered competitive pricing with quality equipment and a 25-year panel and micro-inverter warranty. The installation was completed in one day and we could not be happier with the results.

Brandon T.

5 April 2025
Verified Customer

Good company with solid customer service. The installation went smoothly and the system is performing well. The process from initial consultation to final inspection took about six weeks, which was in line with what they quoted.

Frequently Asked Questions About Barrett Solar

What services does Barrett Solar offer?

Barrett Solar offers Solar Installation, Solar Design, Energy Audit, Grid Connection, Maintenance.

Is Barrett Solar NABCEP certified?

Barrett Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Barrett Solar serve?

Barrett Solar serves Kansas City, Lee's Summit, Independence, Blue Springs, Liberty, Overland Park, Olathe, Lawrence. They are based in Kansas City with a service radius of 160 km.

What warranty does Barrett Solar offer?

Barrett Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Barrett Solar's customer reviews?

Barrett Solar has a 4.8/5 rating based on 100 customer reviews. Customers consistently rate them highly.

How long has Barrett Solar been in business?

Barrett Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Barrett Solar

Fill in your details and we'll connect you with Barrett Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote