BS

Bath Solar Panel Installation

MCS-registered local solar panel specialist serving Bath and the Somerset region

Bath, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

50 km

Service Area

1-10

Employees

SurgePV Score

5.5 / 10
Customer Reviews
0%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Bath Solar Panel Installation

Bath Solar Panel Installation is a specialist solar PV installer serving Bath and the wider Somerset region, including Bristol, Keynsham, Midsomer Norton, Radstock, and Frome. The company’s team of solar PV installers hold all necessary MCS accreditation and certification, ensuring installations meet UK standards and qualify for the Smart Export Guarantee.

The company focuses on residential and small commercial solar panel installations, working closely with customers to design systems suited to their property’s roof orientation, shading conditions, and energy usage patterns. As a locally-based team with specific knowledge of Bath’s housing stock — which includes a high proportion of Grade II listed stone-built properties and Victorian terraces — the company understands the practical constraints and permissions that can apply to solar installations in a UNESCO World Heritage Site setting.

Bath Solar Panel Installation is RECC-registered, which provides customers with access to consumer protection and a formal dispute resolution process. All installations are carried out to the standards set by MCS and the Renewable Energy Consumer Code.

For Bath homeowners seeking a locally-based installer with direct knowledge of the area rather than a regional or national contractor, Bath Solar Panel Installation offers a personalised service backed by the necessary industry accreditations. Contact details and further information are available via their website at bathsolarpanelinstallation.co.uk.

Service Area

Bath Solar Panel Installation serves the following areas within a 50 km radius:

BathBristolKeynshamMidsomer NortonRadstockFrome

Are you Bath Solar Panel Installation?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Bath Solar Panel Installation

What services does Bath Solar Panel Installation offer?

Bath Solar Panel Installation offers Solar Installation, Battery Storage, Maintenance.

Is Bath Solar Panel Installation MCS certified?

Yes, Bath Solar Panel Installation is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Bath Solar Panel Installation serve?

Bath Solar Panel Installation serves Bath, Bristol, Keynsham, Midsomer Norton, Radstock, Frome. They are based in Bath with a service radius of 50 km.

What warranty does Bath Solar Panel Installation offer?

Bath Solar Panel Installation offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Bath Solar Panel Installation's customer reviews?

Bath Solar Panel Installation does not have any reviews yet. Be the first to leave a review after using their services.

How long has Bath Solar Panel Installation been in business?

Bath Solar Panel Installation was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Bath Solar Panel Installation

Fill in your details and we'll connect you with Bath Solar Panel Installation.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote