S&J Bath Solar Energy
Local Bath solar installer offering wind-resistant panel systems with MCS installation
2026+
Years in Business
1
Customer Reviews
40 km
Service Area
1-10
Employees
SurgePV Score
About S&J Bath Solar Energy
S&J Bath Solar Energy is a Bath-based solar panel installer focused on residential installations across Bath and the surrounding Somerset area, including Radstock, Midsomer Norton, Keynsham, Frome, and Bradford on Avon. The company offers free site surveys for prospective customers before any commitment is made.
One of the distinguishing features of S&J Bath Solar Energy’s product range is the use of solar mounting systems with certified wind resistance more than four times greater than standard products, making them suitable for exposed locations and properties with challenging roof orientations — which is relevant for Bath’s varied hillside housing stock.
The company holds MCS certification for its solar panel installations, a requirement for customers wishing to register with the Smart Export Guarantee. As a locally-based installer, S&J Bath Solar Energy offers personalised service for Bath homeowners rather than the more standardised process of national installers.
Contact is available by phone on 01225 951223 or by email at [email protected]. Further information and the free site survey request form are available at sandjbathsolarenergy.co.uk. Specific address, founding year, and review data were not publicly available at time of research.
Service Area
S&J Bath Solar Energy serves the following areas within a 40 km radius:
Contact Information
Are you S&J Bath Solar Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About S&J Bath Solar Energy
What services does S&J Bath Solar Energy offer?
S&J Bath Solar Energy offers Solar Installation.
Is S&J Bath Solar Energy MCS certified?
Yes, S&J Bath Solar Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does S&J Bath Solar Energy serve?
S&J Bath Solar Energy serves Bath, Radstock, Midsomer Norton, Keynsham, Frome, Bradford on Avon. They are based in Bath with a service radius of 40 km.
What warranty does S&J Bath Solar Energy offer?
S&J Bath Solar Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are S&J Bath Solar Energy's customer reviews?
S&J Bath Solar Energy has a 5/5 rating based on 1 customer review. Customers consistently rate them highly.
How long has S&J Bath Solar Energy been in business?
S&J Bath Solar Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bath
Get a Free Solar Quote from S&J Bath Solar Energy
Fill in your details and we'll connect you with S&J Bath Solar Energy.
Quote request sent!
S&J Bath Solar Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile