Benton Electric
Family-owned electrical and solar contractor serving the Willamette Valley since 1967 with 800+ solar installations
59+
Years in Business
800+
Projects Completed
15
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Benton Electric
Benton Electric is a family-owned electrical and solar contracting company with a Eugene office at 2460 W 11th Avenue and its primary location at 34037 Excor Road SW in Albany, Oregon. Serving the Willamette Valley since 1967, the company has been installing residential and commercial photovoltaic systems since 2006, completing over 800 solar installations.
Benton Electric’s team consists of certified specialists who handle the full process from site assessment and system design through installation and utility interconnection. The company provides free solar site assessments to determine installation feasibility and offers both residential and commercial solar solutions.
Benton Electric ranks in the top 2% of Oregon licensed contractors on BuildZoom with a score of 115 and has earned the Expert Choice badge from solar rating platforms. The company serves the entire Willamette Valley, operating from both its Albany headquarters and Eugene office location.
Service Area
Benton Electric serves the following areas within a 62-mile radius:
Contact Information
Are you Benton Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
15 reviews
Jim W.
Benton Electric has been around for over 50 years and their solar division is just as professional. Great installation and the system is producing as promised.
Catherine P.
Family-owned company that treats you like family. They designed a system optimized for our roof angle and it's exceeding production estimates.
George T.
Solid installation and good communication. Over 800 installations gives you confidence they know what they're doing. Recommended.
Frequently Asked Questions About Benton Electric
What services does Benton Electric offer?
Benton Electric offers Solar Installation, Solar Design, Grid Connection, Maintenance.
Is Benton Electric NABCEP certified?
Benton Electric holds the following certifications: Oregon Contractor License. Contact them directly for the latest accreditation details.
What areas does Benton Electric serve?
Benton Electric serves Eugene, Albany, Corvallis, Springfield, Salem. They are based in Eugene with a service radius of 100 km.
What warranty does Benton Electric offer?
Benton Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Benton Electric's customer reviews?
Benton Electric has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Benton Electric been in business?
Benton Electric was founded in 1967 and has been in business for 59 years. They are one of the more experienced solar installers in their area.
Similar Installers in Eugene
Get a Free Solar Quote from Benton Electric
Fill in your details and we'll connect you with Benton Electric.
Quote request sent!
Benton Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile