BP

Black Platinum Solar & Electric

Family-owned solar installer with 1,500+ installations and no subcontractors since 2007

Phoenix, Arizona
4.8 (85 reviews)
Verified
Residential Commercial

19+

Years in Business

1,500+

Projects Completed

85

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

9 / 10
Customer Reviews
96%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
25%

About Black Platinum Solar & Electric

Black Platinum Solar & Electric is a family-owned solar installation company that has been serving the Phoenix Valley since 2007. With over 1,500 completed installations, the company has built a strong reputation for quality workmanship and honest, straightforward service. A defining feature of their business model is that all work is performed by in-house crews, with no subcontractors involved in any project.

The company provides residential and commercial solar installations, battery storage systems, bi-directional EV charger installations, and solar system repairs. Black Platinum is an authorized installer for Panasonic and Enphase, and works with REC, Q Cells, SolarEdge, and Tesla Powerwall. They also specialize in diagnosing and repairing solar systems originally installed by other companies, making them a go-to resource for homeowners with underperforming arrays.

Black Platinum Solar holds BBB accreditation (since 2010) and maintains an Arizona ROC license (232364). The company offers a 25-year product warranty and a 25-year linear performance warranty on panels, along with a 10-year workmanship warranty. Customers consistently praise the owner’s hands-on involvement, transparent pricing, and the team’s willingness to take the time to answer technical questions without pressure.

Service Area

Black Platinum Solar & Electric serves the following areas within a 50-mile radius:

PhoenixScottsdaleTempeMesaChandlerGlendalePeoriaParadise Valley

Are you Black Platinum Solar & Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Solar Design
Energy Audit

Certifications & Accreditations

BBB Accredited ROC Licensed Panasonic Authorized Installer Enphase Authorized Installer

Partner Manufacturers

Panels

PanasonicRECQ Cells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

85 reviews

Steve R.

15 September 2025
Verified Customer

Black Platinum replaced some damaged panels on our existing system quickly and at a fair price. The owner personally oversaw the work and explained everything. Honest company that does not try to upsell.

Maria G.

2 July 2025
Verified Customer

We went with Black Platinum because they are a local family business and do not subcontract any of their work. The installation was clean and professional. Our system is producing exactly as promised.

Dan P.

28 March 2025
Verified Customer

Excellent experience from consultation to final inspection. The team installed our 8 kW system with Panasonic panels and Enphase microinverters in one day. Very responsive to questions even months after install.

Frequently Asked Questions About Black Platinum Solar & Electric

What services does Black Platinum Solar & Electric offer?

Black Platinum Solar & Electric offers Solar Installation, Battery Storage, EV Charging, Maintenance, Solar Design, Energy Audit.

Is Black Platinum Solar & Electric NABCEP certified?

Black Platinum Solar & Electric holds the following certifications: BBB Accredited, ROC Licensed, Panasonic Authorized Installer, Enphase Authorized Installer. Contact them directly for the latest accreditation details.

What areas does Black Platinum Solar & Electric serve?

Black Platinum Solar & Electric serves Phoenix, Scottsdale, Tempe, Mesa, Chandler, Glendale, Peoria, Paradise Valley. They are based in Phoenix with a service radius of 80 km.

What warranty does Black Platinum Solar & Electric offer?

Black Platinum Solar & Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Black Platinum Solar & Electric's customer reviews?

Black Platinum Solar & Electric has a 4.8/5 rating based on 85 customer reviews. Customers consistently rate them highly.

How long has Black Platinum Solar & Electric been in business?

Black Platinum Solar & Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Black Platinum Solar & Electric

Fill in your details and we'll connect you with Black Platinum Solar & Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote