Blue Raven Solar
National solar installer with a dedicated Fort Collins office, installing Tier 1 monocrystalline panels since 2014
12+
Years in Business
21
Customer Reviews
124 mi
Service Area
201-500
Employees
SurgePV Score
About Blue Raven Solar
Blue Raven Solar is a national solar installation company with a dedicated Fort Collins office at 2627 Redwing Road, Unit 230. Founded in 2014 and headquartered in Orem, Utah, Blue Raven Solar (now a SunPower company) operates across multiple states with local teams in each market.
The company installs Tier 1 monocrystalline solar panels from manufacturers including Maxeon, REC, Qcells, Trina, and Jinko, paired with Enphase IQ7+ microinverters that carry a 25-year warranty. Blue Raven specializes in residential solar installations and guides homeowners through the process from initial consultation to system activation, typically completing installations within one to two months.
Blue Raven Solar holds a BBB A+ rating and a Colorado Electrical Contractor License (EC.0101302). The company offers a 25-year product warranty on solar panels and a 10-year workmanship warranty covering free repairs on installation or workmanship errors. The Fort Collins office serves the Northern Colorado region including Loveland, Greeley, and the greater Front Range.
Service Area
Blue Raven Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Blue Raven Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4
21 reviews
Scott B.
Blue Raven handled our Fort Collins installation professionally. The Enphase microinverters and REC panels are performing above estimates. Smooth process from quote to activation.
Michelle D.
Good installation experience. The local Fort Collins team was responsive and the system was installed within the quoted timeline. Happy with production so far.
Jason T.
Competitive pricing and quality panels. The installation was clean and the crew was professional. Monitoring app works well to track daily production.
Frequently Asked Questions About Blue Raven Solar
What services does Blue Raven Solar offer?
Blue Raven Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Monitoring.
Is Blue Raven Solar NABCEP certified?
Blue Raven Solar holds the following certifications: BBB A+ Rating, Colorado Electrical Contractor License. Contact them directly for the latest accreditation details.
What areas does Blue Raven Solar serve?
Blue Raven Solar serves Fort Collins, Denver, Boulder, Colorado Springs, Loveland, Greeley. They are based in Fort Collins with a service radius of 200 km.
What warranty does Blue Raven Solar offer?
Blue Raven Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Blue Raven Solar's customer reviews?
Blue Raven Solar has a 4/5 rating based on 21 customer reviews. They are well-regarded by their customers.
How long has Blue Raven Solar been in business?
Blue Raven Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Fort Collins
Get a Free Solar Quote from Blue Raven Solar
Fill in your details and we'll connect you with Blue Raven Solar.
Quote request sent!
Blue Raven Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile