Blue Tech Electrical
MCS and HIES certified solar PV, battery storage, and EV charger installer in Peterborough and Cambridgeshire
2026+
Years in Business
30
Customer Reviews
60 km
Service Area
1-10
Employees
SurgePV Score
About Blue Tech Electrical
Blue Tech Electrical is a solar PV and electrical services company based at Allia Future Business Centre, Peterborough United Football Club, Peterborough PE2 8AN. Phone: 01733 612305 (Peterborough) or 01480 589179 (Huntingdon office), mobile 07985 742493, email [email protected].
The company holds MCS (Microgeneration Certification Scheme) and HIES (Home Insulation and Energy Systems) accreditations for both Solar PV and Battery Storage installations. Blue Tech Electrical is also NAPIT registered and operates as a Competent Person Scheme member, meaning all electrical work self-certifies to current Building Regulations without requiring local authority notification.
Blue Tech Electrical provides solar panel installation, battery storage, EV charging stations, domestic electrical services (rewires, sockets, new build installations), and PAT testing. The company serves Peterborough and Cambridgeshire including Cambridge, Huntingdon, Ely, and St Neots.
The company was commended in the Regional Solar PV Installer and Contractor of the Year category at the Energy Efficiency Awards 2024, recognising their quality of work and contribution to the local renewable energy sector.
The HIES accreditation provides Blue Tech Electrical’s solar and battery customers with deposit protection and insurance-backed workmanship guarantees. MCS registration ensures all solar PV installations are eligible for Smart Export Guarantee payments. Reviews on Safe Local Trades are positive, highlighting professional and friendly service across both solar and general electrical work.
Service Area
Blue Tech Electrical serves the following areas within a 60 km radius:
Contact Information
Are you Blue Tech Electrical?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Blue Tech Electrical
What services does Blue Tech Electrical offer?
Blue Tech Electrical offers Solar Installation, Battery Storage, EV Charging.
Is Blue Tech Electrical MCS certified?
Yes, Blue Tech Electrical is MCS certified and also holds HIES, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Blue Tech Electrical serve?
Blue Tech Electrical serves Peterborough, Cambridge, Huntingdon, Ely, St Neots. They are based in Peterborough with a service radius of 60 km.
What warranty does Blue Tech Electrical offer?
Blue Tech Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Blue Tech Electrical's customer reviews?
Blue Tech Electrical has a 5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Blue Tech Electrical been in business?
Blue Tech Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Peterborough
Get a Free Solar Quote from Blue Tech Electrical
Fill in your details and we'll connect you with Blue Tech Electrical.
Quote request sent!
Blue Tech Electrical will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile