SE

Story Electrical

NAPIT accredited commercial and domestic electrician and solar PV installer in Peterborough since 2018

Peterborough, UK
5 (35 reviews)
Verified
Residential Commercial

8+

Years in Business

0

35

Customer Reviews

50 km

Service Area

1-10

Employees

SurgePV Score

7.4 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Story Electrical

Story Electrical was founded in 2018 by Mark Story and is based at Unit 14, Spitfire Business Park, Northfield Road, Market Deeping, Peterborough PE6 8WE. Phone: 01733 913133. The company serves Peterborough, Market Deeping, Stamford, Bourne, and Spalding as a commercial and domestic electrical contractor with a specialism in renewable energy installations.

The company is NAPIT accredited, which means all electrical work is carried out by City & Guilds Level 3 certified electricians and is self-certifiable under the Competent Person Scheme. This accreditation covers compliance with the latest Electrical Regulations (BS 7671) across both standard electrical work and renewable energy installations.

Story Electrical’s renewable energy services include solar PV installation, battery storage, and EV charging. The team has built expertise in renewable installations since the company’s founding in 2018. With both commercial and domestic capabilities, Story Electrical serves a range of customer types across the PE postcode area.

The Market Deeping base places Story Electrical at the edge of Peterborough’s postcode area, with easy access to Market Deeping, Stamford, and Bourne, as well as Peterborough city itself. The company offers a professional and technical approach to each installation, with emphasis on neat workmanship and energy system performance.

Story Electrical has been highlighted by Glow Green as one of the recommended solar installers in Peterborough for its technical specialism and professional standards.

Service Area

Story Electrical serves the following areas within a 50 km radius:

PeterboroughMarket DeepingStamfordBourneSpalding

Are you Story Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

NAPIT

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Story Electrical

What services does Story Electrical offer?

Story Electrical offers Solar Installation, Battery Storage, EV Charging.

Is Story Electrical MCS certified?

Story Electrical holds the following certifications: NAPIT. Contact them directly for the latest accreditation details.

What areas does Story Electrical serve?

Story Electrical serves Peterborough, Market Deeping, Stamford, Bourne, Spalding. They are based in Peterborough with a service radius of 50 km.

What warranty does Story Electrical offer?

Story Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Story Electrical's customer reviews?

Story Electrical has a 5/5 rating based on 35 customer reviews. Customers consistently rate them highly.

How long has Story Electrical been in business?

Story Electrical was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Story Electrical

Fill in your details and we'll connect you with Story Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote