Bluenergy Solar
Full-service Florida solar installer with Jacksonville office offering zero-down financing and competitive pricing
7+
Years in Business
25
Customer Reviews
93 mi
Service Area
51-200
Employees
SurgePV Score
About Bluenergy Solar
Bluenergy Solar operates a Jacksonville office at 6420 Southpoint Parkway, Suite 130, Building 2, in Jacksonville. The company provides residential solar panel installations throughout Northeast Florida, offering zero-down financing options with APRs under 3%. Bluenergy Solar is a BBB Accredited company with a licensed solar contractor certification in Florida.
The company installs Qcells and Canadian Solar panels with Enphase and SolarEdge inverters, paired with Tesla Powerwall and Enphase IQ battery storage systems. Bluenergy handles system design, permitting, installation, utility interconnection, and monitoring setup. The company’s financing programs make solar accessible to homeowners who prefer to avoid upfront costs while still benefiting from energy savings.
Bluenergy Solar has a team of 51 to 200 employees across its Florida operations. The Jacksonville office serves the local market including St. Augustine, Jacksonville Beach, Orange Park, Gainesville, and Daytona Beach. Customers note the company’s transparent pricing, efficient installation timelines, and user-friendly monitoring tools. The company’s competitive financing terms and quality equipment have made it a growing presence in the Jacksonville solar market.
Service Area
Bluenergy Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Bluenergy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
25 reviews
Anthony G.
Bluenergy made the solar process simple with their zero-down financing option. The installation crew was efficient and completed the job in a single day. System has been performing well since activation.
Rebecca T.
The team at Bluenergy was professional and transparent about pricing. No hidden fees or surprises. The system design was customized for our roof and energy usage. Good value overall.
Brian K.
Solid installation with quality equipment. The financing terms were competitive with APRs under 3%. The monitoring app gives clear visibility into daily production and savings. Would recommend.
Frequently Asked Questions About Bluenergy Solar
What services does Bluenergy Solar offer?
Bluenergy Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Monitoring.
Is Bluenergy Solar NABCEP certified?
Bluenergy Solar holds the following certifications: BBB Accredited, FL Licensed Solar Contractor. Contact them directly for the latest accreditation details.
What areas does Bluenergy Solar serve?
Bluenergy Solar serves Jacksonville, St. Augustine, Jacksonville Beach, Orange Park, Gainesville, Daytona Beach. They are based in Jacksonville with a service radius of 150 km.
What warranty does Bluenergy Solar offer?
Bluenergy Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bluenergy Solar's customer reviews?
Bluenergy Solar has a 4.5/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Bluenergy Solar been in business?
Bluenergy Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Jacksonville
Get a Free Solar Quote from Bluenergy Solar
Fill in your details and we'll connect you with Bluenergy Solar.
Quote request sent!
Bluenergy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile