Boston Solar
Massachusetts' #1 residential solar contractor with over 6,000 installations since 2011
15+
Years in Business
6,000+
Projects Completed
500
Customer Reviews
50 mi
Service Area
51-100
Employees
SurgePV Score
About Boston Solar
Boston Solar is the largest residential solar installer headquartered in Massachusetts, operating from their office at 55 6th Rd in Woburn. Founded in 2011, the company has completed more than 6,000 solar installations across the state and has been ranked the #1 Massachusetts-based residential solar contractor by Solar Power World. All installation crews are in-house employees rather than subcontractors.
The company installs SunPower panels and offers battery storage solutions including Tesla Powerwall. Boston Solar handles residential and commercial projects across Greater Boston and eastern Massachusetts, managing the full process from design through permitting, installation, and utility interconnection. They also install EV charging stations.
Boston Solar holds a 4.9-star rating from over 500 Google reviews. The company is a SunPower Certified Dealer and maintains NABCEP-certified staff. They are not BBB accredited but have operated continuously since 2011 with a dedicated customer service team familiar with Massachusetts solar incentive programs.
Service Area
Boston Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Boston Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
500 reviews
Sarah M.
Boston Solar made the entire process seamless. From the initial consultation to the final installation, the team was professional and knowledgeable. Our electricity bills have dropped significantly.
Mark T.
Great experience from start to finish. The crew was on time, clean, and efficient. The system has been performing above projections since day one.
Jennifer L.
Responsive team, competitive pricing, and excellent workmanship. They handled all the permitting and utility paperwork without any hassle.
Frequently Asked Questions About Boston Solar
What services does Boston Solar offer?
Boston Solar offers Solar Installation, Battery Storage, EV Charging.
Is Boston Solar NABCEP certified?
Yes, Boston Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Boston Solar serve?
Boston Solar serves Boston, Woburn, Cambridge, Somerville, Newton, Brookline. They are based in Boston with a service radius of 80 km.
What warranty does Boston Solar offer?
Boston Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Boston Solar's customer reviews?
Boston Solar has a 4.9/5 rating based on 500 customer reviews. Customers consistently rate them highly.
How long has Boston Solar been in business?
Boston Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Boston
Get a Free Solar Quote from Boston Solar
Fill in your details and we'll connect you with Boston Solar.
Quote request sent!
Boston Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile