Brightstar Solar
Massachusetts solar specialists for residential, commercial, and specialty roofs since 2009
17+
Years in Business
700+
Projects Completed
50
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Brightstar Solar
Brightstar Solar is a Massachusetts-based solar installation company founded in 2009 by Jonathan and Mona Reese. Operating from 257 Maple St, Unit 2 in Marlborough, the company has designed and installed over 700 solar systems for residential, commercial, and public customers across Massachusetts and Connecticut. Brightstar has been ranked a Top Solar Contractor by Solar Power World for 13 consecutive years.
The company is known for its expertise with specialty roof types, including slate and Spanish tile roofs common on historic New England homes. Brightstar handles all aspects of solar PV installation from marketing and design through installation and ongoing maintenance. They serve the MetroWest and Greater Boston areas.
Brightstar Solar holds an A+ rating with the BBB, where their file has been open since 2010. The company maintains NABCEP-certified staff and installs equipment from leading manufacturers including REC, Silfab, Enphase, and SolarEdge.
Service Area
Brightstar Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Brightstar Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
50 reviews
Chris W.
Brightstar Solar did an excellent job on our historic home with a slate roof. They understood the complexities involved and delivered a clean, professional installation.
Amanda S.
Jonathan and his team were knowledgeable, patient, and thorough. The whole process from consultation to installation was smooth. Highly recommend.
Robert P.
Great local company. They handled everything including permitting and incentive applications. Our system is producing exactly as promised.
Frequently Asked Questions About Brightstar Solar
What services does Brightstar Solar offer?
Brightstar Solar offers Solar Installation, Battery Storage, Maintenance.
Is Brightstar Solar NABCEP certified?
Yes, Brightstar Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Brightstar Solar serve?
Brightstar Solar serves Boston, Marlborough, Worcester, Framingham, Natick, Wellesley. They are based in Boston with a service radius of 80 km.
What warranty does Brightstar Solar offer?
Brightstar Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Brightstar Solar's customer reviews?
Brightstar Solar has a 4.9/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has Brightstar Solar been in business?
Brightstar Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Boston
Get a Free Solar Quote from Brightstar Solar
Fill in your details and we'll connect you with Brightstar Solar.
Quote request sent!
Brightstar Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile