Bright Home Energy
Mesa-based solar energy contractor providing sustainable residential and commercial solar solutions with energy storage
2026+
Years in Business
18
Customer Reviews
37 mi
Service Area
1-10
Employees
SurgePV Score
About Bright Home Energy
Bright Home Energy is a solar energy contractor located at 1424 S Sunnyvale, Mesa, AZ 85206. The company provides residential and commercial solar installation, energy storage solutions, and energy efficiency services across the Phoenix metro area.
Bright Home Energy offers solar panel installation, battery backup systems, smart thermostats, aeroseal duct sealing, insulation, and demand management systems. Their licensed and insured technicians handle all installations, and battery storage solutions allow customers to store excess power for use during outages or peak rate periods.
The company serves Mesa, Phoenix, Scottsdale, Tempe, Chandler, and Gilbert, focusing on delivering cost-effective energy solutions that go beyond solar to include comprehensive home energy optimization.
Service Area
Bright Home Energy serves the following areas within a 37-mile radius:
Contact Information
Are you Bright Home Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
18 reviews
Verified Customer
Bright Home Energy installed our solar system and battery backup. The team was professional and the system has been performing well. Appreciate the energy savings.
Verified Customer
Good experience with Bright Home Energy. They explained all the options including smart thermostats and insulation to maximize our energy savings beyond just solar.
Verified Customer
Solid installation and competitive pricing. The system is producing as expected and the battery backup gives us peace of mind during peak rate periods.
Frequently Asked Questions About Bright Home Energy
What services does Bright Home Energy offer?
Bright Home Energy offers Solar Installation, Battery Storage, energy_efficiency.
Is Bright Home Energy NABCEP certified?
Bright Home Energy holds the following certifications: Licensed and Insured Contractor. Contact them directly for the latest accreditation details.
What areas does Bright Home Energy serve?
Bright Home Energy serves Mesa, Phoenix, Scottsdale, Tempe, Chandler, Gilbert. They are based in Mesa with a service radius of 60 km.
What warranty does Bright Home Energy offer?
Bright Home Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bright Home Energy's customer reviews?
Bright Home Energy has a 4.5/5 rating based on 18 customer reviews. Customers consistently rate them highly.
How long has Bright Home Energy been in business?
Bright Home Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Mesa
Get a Free Solar Quote from Bright Home Energy
Fill in your details and we'll connect you with Bright Home Energy.
Quote request sent!
Bright Home Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile