B

Brightergy

Kansas City commercial solar specialist since 2010 with over 1,200 projects completed using journeyman electricians

Kansas City, Missouri
4.6 (40 reviews)
Verified
Commercial

16+

Years in Business

1,200+

Projects Completed

40

Customer Reviews

186 mi

Service Area

11-50

Employees

SurgePV Score

9.1 / 10
Customer Reviews
92%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Brightergy

Brightergy is a Kansas City-based commercial solar company founded in 2010 by CEO Adam Blake. The company focuses exclusively on commercial-scale solar installations, using professional journeyman electricians for every project rather than general laborers. With over 1,200 commercial solar projects completed across the Midwest, Brightergy is one of the most experienced commercial solar installers in the region. The company operates from a LEED-certified headquarters at 1627 Main Street in Kansas City.

Brightergy handles the full project lifecycle for commercial solar, including financing, design, engineering, permitting, installation, interconnection, and ongoing monitoring and maintenance. The company also offers energy efficiency services including LED lighting upgrades and utility data management. In partnership with Barts Electric, a national electrical contractor, Brightergy has expanded its capacity to develop large commercial solar projects and service existing arrays across a wider geographic area.

Brightergy serves commercial clients throughout Missouri and Kansas, with additional offices in St. Louis and Boston. The company works with businesses of all sizes, from small retail locations to large distribution centers and manufacturing facilities. Brightergy has earned recognition including the Kansas City Business Journal Best Places to Work award and the Kansas City Chamber of Commerce Small Business of the Year award.

Service Area

Brightergy serves the following areas within a 186-mile radius:

Kansas CitySt. LouisTopekaWichitaColumbiaSpringfield

Are you Brightergy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Energy Audit
Maintenance
Monitoring
Grid Connection

Certifications & Accreditations

BBB Accredited LEED Certified HQ

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

40 reviews

Warren G.

18 September 2025
Verified Customer

Brightergy installed a 200 kW system on our distribution center. Their team of journeyman electricians handled the entire project professionally. The system is generating the projected output and the ongoing monitoring is a valuable service.

Lisa M.

25 June 2025
Verified Customer

We chose Brightergy for our office building solar project because of their commercial focus and track record. They managed everything from financing and design to permits and installation. The energy savings have been significant.

Jeff H.

15 February 2025
Verified Customer

Brightergy delivered a quality commercial installation for our retail location. The team was knowledgeable about tax incentives and helped structure the financing. The project took a bit longer than quoted due to permitting, but the end result was worth the wait.

Frequently Asked Questions About Brightergy

What services does Brightergy offer?

Brightergy offers Solar Installation, Solar Design, Energy Audit, Maintenance, Monitoring, Grid Connection.

Is Brightergy NABCEP certified?

Brightergy holds the following certifications: BBB Accredited, LEED Certified HQ. Contact them directly for the latest accreditation details.

What areas does Brightergy serve?

Brightergy serves Kansas City, St. Louis, Topeka, Wichita, Columbia, Springfield. They are based in Kansas City with a service radius of 300 km.

What warranty does Brightergy offer?

Brightergy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Brightergy's customer reviews?

Brightergy has a 4.6/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Brightergy been in business?

Brightergy was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Brightergy

Fill in your details and we'll connect you with Brightergy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote