BS

Brightest Solar

Charleston's local solar energy distributor established in 2015 serving residential solar and pool heating

Charleston, South Carolina
4.5 (12 reviews)
Verified
Residential

11+

Years in Business

0

12

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

7.9 / 10
Customer Reviews
90%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Brightest Solar

Brightest Solar is a locally owned solar energy company based at 2979 Foxhall Road in Charleston, with a business presence at 170 Meeting Street in downtown Charleston. Founded in 2015 by Rob Dodge, the company provides residential solar panel installations and solar pool heating systems for homeowners across the Charleston area. As a small local operation, Brightest Solar offers personalized service with the owner directly involved in each project.

The company installs Hanwha Q Cells solar panels paired with Enphase microinverters. Brightest Solar handles the full installation process from site assessment and system design through permitting, installation, and utility interconnection. The company also specializes in solar pool heating, a service that is particularly relevant in Charleston’s climate where pool season extends well beyond summer months.

Brightest Solar holds a 4.5-star rating across review platforms and maintains BBB accreditation. The company’s small, owner-operated model means customers work directly with Rob and his team rather than navigating a larger corporate structure. Customers highlight the personal attention, local knowledge, and honest approach to system sizing and pricing.

Service Area

Brightest Solar serves the following areas within a 50-mile radius:

CharlestonWest AshleyJames IslandMount PleasantNorth CharlestonSummervilleFolly Beach

Are you Brightest Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Energy Audit
Grid Connection

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Panels

Hanwha Q Cells

Inverters

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

12 reviews

Paula M.

8 September 2025
Verified Customer

Rob and his team at Brightest Solar were fantastic. They're truly local to Charleston and understood our specific needs. The installation was professional and the system works great.

Kevin S.

14 June 2025
Verified Customer

Good experience with a small local company. They were responsive and honest about what to expect. The system is producing as estimated and our bills are lower.

Amy J.

22 March 2025
Verified Customer

We wanted to support a local business and Brightest Solar delivered. The owner Rob was personally involved in our project and made sure everything was done right.

Frequently Asked Questions About Brightest Solar

What services does Brightest Solar offer?

Brightest Solar offers Solar Installation, Solar Design, Energy Audit, Grid Connection.

Is Brightest Solar NABCEP certified?

Brightest Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Brightest Solar serve?

Brightest Solar serves Charleston, West Ashley, James Island, Mount Pleasant, North Charleston, Summerville, Folly Beach. They are based in Charleston with a service radius of 80 km.

What warranty does Brightest Solar offer?

Brightest Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Brightest Solar's customer reviews?

Brightest Solar has a 4.5/5 rating based on 12 customer reviews. Customers consistently rate them highly.

How long has Brightest Solar been in business?

Brightest Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Brightest Solar

Fill in your details and we'll connect you with Brightest Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote