Cambridge Renewables
MCS and RECC certified solar PV and battery storage installer for Norfolk and the East of England
4+
Years in Business
15
Customer Reviews
80 km
Service Area
1-10
Employees
SurgePV Score
About Cambridge Renewables
Cambridge Renewables is a solar PV and battery storage company serving Norfolk, Cambridge, and the wider East of England region. The company was founded in 2022, initially operating as a distributor of battery energy storage systems before expanding to offer a full service covering consultation, bespoke system design, installation, and ongoing maintenance for residential and commercial clients across the UK.
Cambridge Renewables is fully accredited by MCS and RECC (Renewable Energy Consumer Code), providing customers with both technical quality assurance and consumer protection throughout the installation process. The company installs solar PV systems and battery storage for homes and businesses across Norfolk, with service extending into Cambridgeshire and Suffolk.
Customer feedback highlights Cambridge Renewables’ high-quality installation work and technical depth, particularly the team’s expertise in integrating solar systems with smart energy tariffs and battery charging schedules. One customer noted the “extremely high” quality of installation work and recommended the company without hesitation for both domestic and commercial projects. Another specifically praised the detailed advice provided on maximising savings through Octopus Energy integration.
The company’s dual MCS and RECC accreditation means customers benefit from comprehensive consumer protections, including the right to access dispute resolution services if any issues arise after installation.
Cambridge Renewables can be contacted on 01638 750660 or at [email protected] to arrange a consultation and quote for solar panel installation in Norfolk.
Service Area
Cambridge Renewables serves the following areas within a 80 km radius:
Contact Information
Are you Cambridge Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
15 reviews
Norfolk Customer
The quality of the installation work was extremely high and I would have no doubts in recommending Cambridge Renewables for domestic or commercial installations.
Norfolk Business Owner
Professional and timely throughout. Especially helpful with advice on integrating with Octopus Energy and optimising battery charging schedules. Would definitely recommend.
Frequently Asked Questions About Cambridge Renewables
What services does Cambridge Renewables offer?
Cambridge Renewables offers Solar Installation, Battery Storage, Maintenance.
Is Cambridge Renewables MCS certified?
Yes, Cambridge Renewables is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Cambridge Renewables serve?
Cambridge Renewables serves Norwich, Norfolk, Cambridge, Newmarket, Bury St Edmunds, Peterborough. They are based in Norwich with a service radius of 80 km.
What warranty does Cambridge Renewables offer?
Cambridge Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Cambridge Renewables's customer reviews?
Cambridge Renewables has a 4.9/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Cambridge Renewables been in business?
Cambridge Renewables was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Norwich
Get a Free Solar Quote from Cambridge Renewables
Fill in your details and we'll connect you with Cambridge Renewables.
Quote request sent!
Cambridge Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile