CS

Cambridge Solar

Award-winning MCS certified solar PV, battery storage, and EV charger installer based near Peterborough since 2009

Peterborough, UK
4.6 (5 reviews)
Verified
Residential Commercial

17+

Years in Business

0

5

Customer Reviews

60 km

Service Area

11-50

Employees

SurgePV Score

7.8 / 10
Customer Reviews
92%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Cambridge Solar

Cambridge Solar is an MCS-approved solar panel installation company established in 2009, based at Unit 17 Orton Enterprise Centre, Bakewell Road, Orton Southgate, Peterborough PE2 6XU. Phone: 01223 863885. The company serves Peterborough and the surrounding Cambridgeshire region, including Cambridge, Huntingdon, Ely, and St Ives.

The company was founded by Owen Morgan, who holds a BEng in Engineering from the University of Warwick and an MSc in Architecture: Advanced Environmental and Energy Studies from the Centre for Alternative Technology in Wales. The team collectively has over 20 years of industry experience, and Morgan himself has designed and installed renewable energy systems internationally.

Cambridge Solar specialises in customised solar energy systems for residential and commercial properties, battery storage solutions, and EV charging installation. The company takes a consultative approach to system design, investing time in selecting reliable components with strong warranties and UK-based technical support. This includes attention to all system components — generation meters, isolators, cabling, panels, and inverters — each covered by the company’s warranty provision.

As an MCS-approved installer, Cambridge Solar customers are eligible for the Smart Export Guarantee. The Orton Southgate base in Peterborough means the company provides genuinely local service to PE postcode customers. With 15+ years of trading, Cambridge Solar has accumulated experience across a wide range of property types and roof configurations in the Peterborough area.

Customer feedback notes a local, responsive approach to customer service and long-term system performance in line with initial projections.

Service Area

Cambridge Solar serves the following areas within a 60 km radius:

PeterboroughCambridgeHuntingdonElySt Ives

Are you Cambridge Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Cambridge Solar

What services does Cambridge Solar offer?

Cambridge Solar offers Solar Installation, Battery Storage, EV Charging.

Is Cambridge Solar MCS certified?

Yes, Cambridge Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Cambridge Solar serve?

Cambridge Solar serves Peterborough, Cambridge, Huntingdon, Ely, St Ives. They are based in Peterborough with a service radius of 60 km.

What warranty does Cambridge Solar offer?

Cambridge Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Cambridge Solar's customer reviews?

Cambridge Solar has a 4.6/5 rating based on 5 customer reviews. Customers consistently rate them highly.

How long has Cambridge Solar been in business?

Cambridge Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Cambridge Solar

Fill in your details and we'll connect you with Cambridge Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote