Chiltern Solar
Southern England's solar and battery storage experts since 2011 — over 150 five-star Google reviews
15+
Years in Business
150
Customer Reviews
80 km
Service Area
11-50
Employees
SurgePV Score
About Chiltern Solar
Chiltern Solar is based at Unit 11 Anglo Business Park, Asheridge Road, Chesham, HP5 2QA, and serves Reading and the wider Berkshire, Buckinghamshire, Hertfordshire and Oxfordshire region. Founded in 2011, the company has more than 100 years of combined team expertise in solar PV installation and battery storage systems for residential and commercial properties.
The company is MCS and NICEIC accredited and installs systems using SolarEdge power optimisers and Enphase micro inverters for maximum energy yield. Chiltern Solar designs each system to match the specific roof orientation and energy consumption patterns of each property, with a focus on long-term performance and reliability.
Chiltern Solar holds a perfect 5.0-star rating on Google from over 150 reviews. Customers consistently praise the company’s competitive pricing, clear communication and quality of workmanship, with many reporting significant reductions in their energy bills after installation.
Service Area
Chiltern Solar serves the following areas within a 80 km radius:
Contact Information
Are you Chiltern Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
150 reviews
Chris B.
Excellent service from Chiltern Solar throughout. The Solar PV system was installed quickly with excellent service from their team on-site and in the office. Would happily recommend their services to anyone in the area!
Helen P.
Competitive pricing, high-quality workmanship, and excellent communication throughout the installation process. Our energy bills have significantly reduced, especially during winter months, thanks to the effective battery system.
Richard G.
Professional and respectful approach with neat workmanship during both the solar panel and battery storage setup. The team explained everything clearly and left the property spotless.
Frequently Asked Questions About Chiltern Solar
What services does Chiltern Solar offer?
Chiltern Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is Chiltern Solar MCS certified?
Yes, Chiltern Solar is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Chiltern Solar serve?
Chiltern Solar serves Reading, Chesham, High Wycombe, Aylesbury, Maidenhead, Slough. They are based in Reading with a service radius of 80 km.
What warranty does Chiltern Solar offer?
Chiltern Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Chiltern Solar's customer reviews?
Chiltern Solar has a 5/5 rating based on 150 customer reviews. Customers consistently rate them highly.
How long has Chiltern Solar been in business?
Chiltern Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Reading
Get a Free Solar Quote from Chiltern Solar
Fill in your details and we'll connect you with Chiltern Solar.
Quote request sent!
Chiltern Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile