KS

Kimble Solar

Award-winning MCS and NICEIC certified solar, battery, and EV charger installer serving Reading and Berkshire since 2011

Reading, UK
5 (80 reviews)
Verified
Residential Commercial

15+

Years in Business

0

80

Customer Reviews

60 km

Service Area

11-50

Employees

SurgePV Score

8.7 / 10
Customer Reviews
100%
Certifications
100%
Experience
85%
Services Range
90%
Warranty Coverage
40%
Online Presence
75%

About Kimble Solar

Kimble Solar (trading name of Kimbletech Ltd) is a family-run solar PV, battery storage, and EV charging installer based in High Wycombe, Buckinghamshire. Founded in 2011 by Chris Sadler, the company has been serving homeowners and businesses across Berkshire — including Reading, Newbury, Windsor, and Bracknell — for over a decade. Kimble Solar was named Which? Renewables Installer of the Year 2025, reflecting the company’s consistent record of high-quality installations and customer service.

The company holds MCS certification, NICEIC approval, RECC membership, and ECA accreditation. These credentials ensure that all installations qualify for the Smart Export Guarantee (SEG) and are carried out to the highest industry standards. On Checkatrade, Kimble Solar holds a 10.0 out of 10 rating from 49 verified reviews, and a 5-star rating from 80 Trustpilot reviews.

Kimble Solar’s in-house team designs bespoke solar PV systems for a wide range of residential and commercial properties across Berkshire and Buckinghamshire. The company installs panels, battery storage systems, and EV chargers, and provides comprehensive aftercare including guidance on SEG applications and system monitoring.

Customer feedback consistently highlights Kimble Solar’s technical depth, transparent communication, and meticulous workmanship. Reviewers frequently note that the team are the most technically knowledgeable among the installers they approached, and that quotations, documents, and grid connection applications are handled promptly and accurately.

Service Area

Kimble Solar serves the following areas within a 60 km radius:

ReadingNewburyWindsorBracknellHigh WycombeOxfordGuildford

Are you Kimble Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS NICEIC RECC ECA

Warranty Coverage

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

80 reviews

Tim S.

3 November 2025
Verified Customer

Kimble Solar were easy to communicate with and engaging throughout, and the work was carried out to a very high standard. The systems work as advertised.

Fiona R.

17 August 2025
Verified Customer

Far and away the most competent of all the solar companies we contacted. Technical information was made very clear and the fitting was flawless.

Andrew G.

29 May 2025
Verified Customer

Very efficient and professional. Design, advice, and technical support were outstanding, and all documents were provided for the Smart Export Guarantee application.

Frequently Asked Questions About Kimble Solar

What services does Kimble Solar offer?

Kimble Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Kimble Solar MCS certified?

Yes, Kimble Solar is MCS certified and also holds NICEIC, RECC, ECA certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Kimble Solar serve?

Kimble Solar serves Reading, Newbury, Windsor, Bracknell, High Wycombe, Oxford, Guildford. They are based in Reading with a service radius of 60 km.

What warranty does Kimble Solar offer?

Kimble Solar offers 10-year installation/workmanship warranty.

How are Kimble Solar's customer reviews?

Kimble Solar has a 5/5 rating based on 80 customer reviews. Customers consistently rate them highly.

How long has Kimble Solar been in business?

Kimble Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Kimble Solar

Fill in your details and we'll connect you with Kimble Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote