CS

CKR Solar

Alabama's top-ranked solar installer specializing in custom solar-plus-storage systems with Tesla Powerwall

Birmingham, Alabama
4.5 (35 reviews)
Verified
Residential Commercial

6+

Years in Business

35

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

7.7 / 10
Customer Reviews
90%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
70%
Online Presence
100%

About CKR Solar

CKR Solar & Storage is a solar installation company with offices in Birmingham and Dothan, Alabama, in addition to its headquarters in Land O’ Lakes, Florida. The company specializes in custom solar panel installations paired with battery backup systems, including Tesla Powerwall. CKR Solar has been ranked as the number one solar installer in Alabama by Ohm Analytics, reflecting the company’s rapid growth in the state market.

CKR Solar provides residential and commercial solar installations across Alabama, Florida, Georgia, and Louisiana. Every project includes custom system design, permitting, professional installation, and utility interconnection. The company is a Tesla Powerwall Certified Installer and focuses on integrated solar-plus-storage solutions that provide both energy savings and backup power capability.

The Birmingham office serves homeowners and businesses throughout central and southern Alabama. CKR Solar offers free consultations and detailed energy assessments to help customers understand their solar potential and expected return on investment. The company maintains active profiles on EnergySage and the Better Business Bureau.

Service Area

CKR Solar serves the following areas within a 124-mile radius:

BirminghamHooverTuscaloosaDothanMontgomeryAuburnHuntsville

Are you CKR Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design

Certifications & Accreditations

Tesla Powerwall Certified Installer

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

35 reviews

Verified Customer

5 September 2025
Verified Customer

CKR Solar designed a system that maximized our roof space and included a Tesla Powerwall for backup. The installation was completed in one day and the system has been performing above the projected output.

Verified Customer

18 June 2025
Verified Customer

We compared three quotes and CKR offered the best value with premium equipment. Their team handled all the permitting with Alabama Power and the interconnection was completed within two weeks of installation.

Verified Customer

22 March 2025
Verified Customer

Good installation experience. The crew was professional and cleaned up thoroughly. The monitoring app works well and we can see production data in real time. Slightly longer wait for permitting than expected.

Frequently Asked Questions About CKR Solar

What services does CKR Solar offer?

CKR Solar offers Solar Installation, Battery Storage, Solar Design.

Is CKR Solar NABCEP certified?

CKR Solar holds the following certifications: Tesla Powerwall Certified Installer. Contact them directly for the latest accreditation details.

What areas does CKR Solar serve?

CKR Solar serves Birmingham, Hoover, Tuscaloosa, Dothan, Montgomery, Auburn, Huntsville. They are based in Birmingham with a service radius of 200 km.

What warranty does CKR Solar offer?

CKR Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are CKR Solar's customer reviews?

CKR Solar has a 4.5/5 rating based on 35 customer reviews. Customers consistently rate them highly.

How long has CKR Solar been in business?

CKR Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from CKR Solar

Fill in your details and we'll connect you with CKR Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote