EL

EV-PV Ltd

MCS-certified solar PV, battery storage, and EV charger installer in Sutton Coldfield, Birmingham

Birmingham, UK
5 (30 reviews)
Verified
Residential Commercial

17+

Years in Business

30

Customer Reviews

50 km

Service Area

SurgePV Score

8.6 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
70%
Online Presence
50%

About EV-PV Ltd

EV-PV Ltd is a solar PV, battery storage, and EV charger installer based at 33 All Saints Drive in Sutton Coldfield, north Birmingham. Established in 2009, the company is MCS-certified, RECC-registered, and TrustMark-approved, providing residential and commercial renewable energy solutions across the West Midlands.

Led by owner Gary, EV-PV has built a strong local reputation with a 5-star customer review rating. The company handles the full installation process in-house, from initial survey and system design through to commissioning and handover. Their services cover solar panel installation, battery storage systems, and EV charging points for both homes and businesses.

As an MCS-certified installer, EV-PV’s solar systems qualify for the Smart Export Guarantee and the current 0% VAT rate on domestic installations. The company’s combined expertise in solar PV and EV charging means they can design integrated systems that maximise self-consumption of generated electricity.

Service Area

EV-PV Ltd serves the following areas within a 50 km radius:

BirminghamSutton ColdfieldSolihullTamworthLichfield

Are you EV-PV Ltd?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS RECC TrustMark

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

30 reviews

Sutton Coldfield Homeowner

12 November 2025
Verified Customer

Gary was fantastic - very friendly and knowledgeable. He explained everything clearly and the installation was completed to a very high standard. Highly recommended.

Four Oaks Resident

28 September 2025
Verified Customer

Good communication prior to the installation and work carried out to a high standard. Gary was very friendly and considerate of our property throughout.

Frequently Asked Questions About EV-PV Ltd

What services does EV-PV Ltd offer?

EV-PV Ltd offers Solar Installation, Battery Storage, EV Charging.

Is EV-PV Ltd MCS certified?

Yes, EV-PV Ltd is MCS certified and also holds RECC, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does EV-PV Ltd serve?

EV-PV Ltd serves Birmingham, Sutton Coldfield, Solihull, Tamworth, Lichfield. They are based in Birmingham with a service radius of 50 km.

What warranty does EV-PV Ltd offer?

EV-PV Ltd offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are EV-PV Ltd's customer reviews?

EV-PV Ltd has a 5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has EV-PV Ltd been in business?

EV-PV Ltd was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from EV-PV Ltd

Fill in your details and we'll connect you with EV-PV Ltd.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote