CS

Colorado Solar Co

Northern Colorado solar installer providing residential solar systems with clean, precise installations since 2023

Fort Collins, Colorado
4.8 (10 reviews)
Verified
Residential

3+

Years in Business

0

10

Customer Reviews

62 mi

Service Area

2-10

Employees

SurgePV Score

7 / 10
Customer Reviews
96%
Certifications
60%
Experience
50%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About Colorado Solar Co

Colorado Solar Co is a solar installation company based in Wellington, Colorado, serving Northern Colorado and Southern Wyoming. Founded in 2023 by Justin and Crystal Baker, the company focuses on bringing sustainable energy and value to homeowners in the Fort Collins, Wellington, Greeley, Loveland, and Cheyenne areas.

The company emphasizes quality craftsmanship in its installations, featuring clean lines, precise panel placement, and internal conduit runs that eliminate visible cords. Colorado Solar Co handles the full installation process from initial consultation and system design through permitting and final commissioning.

Though newer to the market, Colorado Solar Co has built a strong reputation for attention to detail and customer satisfaction, earning positive reviews from homeowners throughout Northern Colorado.

Service Area

Colorado Solar Co serves the following areas within a 62-mile radius:

Fort CollinsWellingtonGreeleyLovelandCheyenne

Are you Colorado Solar Co?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Grid Connection

Certifications & Accreditations

Colorado Contractor License

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

10 reviews

Tyler B.

5 November 2025
Verified Customer

Colorado Solar Co did a fantastic job on our installation. Clean lines, precise work, and no visible cords thanks to their internal conduit runs.

Ashley M.

20 August 2025
Verified Customer

Justin and Crystal were great to work with. They took the time to explain everything and the final result looks amazing on our roof.

Brian K.

10 June 2025
Verified Customer

Local company that cares about quality. The installation was completed on schedule and our system is generating more power than we expected.

Frequently Asked Questions About Colorado Solar Co

What services does Colorado Solar Co offer?

Colorado Solar Co offers Solar Installation, Solar Design, Grid Connection.

Is Colorado Solar Co NABCEP certified?

Colorado Solar Co holds the following certifications: Colorado Contractor License. Contact them directly for the latest accreditation details.

What areas does Colorado Solar Co serve?

Colorado Solar Co serves Fort Collins, Wellington, Greeley, Loveland, Cheyenne. They are based in Fort Collins with a service radius of 100 km.

What warranty does Colorado Solar Co offer?

Colorado Solar Co offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Colorado Solar Co's customer reviews?

Colorado Solar Co has a 4.8/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Colorado Solar Co been in business?

Colorado Solar Co was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Colorado Solar Co

Fill in your details and we'll connect you with Colorado Solar Co.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote