Comalli Group
NYSERDA-approved electrical contractor and solar installer with nearly 40 years of industry experience in Albany
40+
Years in Business
20
Customer Reviews
50 mi
Service Area
51-200
Employees
SurgePV Score
About Comalli Group
Comalli Group is an electrical contracting and solar installation company headquartered at 111 Exchange Street in Albany, NY. Founded in 1986, the company has nearly 40 years of industry experience and has been a NYSERDA-approved solar installer for over 13 years. Comalli Group provides commercial, industrial, and residential solar solutions.
The company’s background as a licensed electrical contractor gives it deep expertise in panel upgrades, electrical integration, and code compliance. Comalli Group offers solar installation, LED lighting upgrades, battery storage, and energy efficiency services. The energy specialists can be reached directly at (518) 418-7594.
Comalli Group serves the Albany Capital District including Latham, Troy, Schenectady, Saratoga Springs, and surrounding areas. The company handles the full solar project lifecycle from design and engineering through installation and utility interconnection, and assists customers with NYSERDA incentives and net metering programs.
Service Area
Comalli Group serves the following areas within a 50-mile radius:
Contact Information
Are you Comalli Group?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
20 reviews
Rick A.
Comalli Group handled our commercial solar installation in Albany professionally. Their electrical expertise made the integration with our existing systems seamless.
Angela C.
Good company with strong local roots. The residential solar installation was well done and the crew was experienced. Responsive to questions after installation.
Vincent D.
As an electrical contractor turned solar installer, Comalli brings a level of technical competence that is noticeable. Our system was installed cleanly and has performed well.
Frequently Asked Questions About Comalli Group
What services does Comalli Group offer?
Comalli Group offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Maintenance.
Is Comalli Group NABCEP certified?
Comalli Group holds the following certifications: NYSERDA Approved. Contact them directly for the latest accreditation details.
What areas does Comalli Group serve?
Comalli Group serves Albany, Latham, Troy, Schenectady, Saratoga Springs, Clifton Park. They are based in Albany with a service radius of 80 km.
What warranty does Comalli Group offer?
Comalli Group offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Comalli Group's customer reviews?
Comalli Group has a 4.4/5 rating based on 20 customer reviews. They are well-regarded by their customers.
How long has Comalli Group been in business?
Comalli Group was founded in 1986 and has been in business for 40 years. They are one of the more experienced solar installers in their area.
Similar Installers in Albany
Get a Free Solar Quote from Comalli Group
Fill in your details and we'll connect you with Comalli Group.
Quote request sent!
Comalli Group will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile