CE

Connected Energy Solar

Owner-operated Pittsburgh solar company with NABCEP-certified technicians and a reputation for honest, personalized service

Pittsburgh, Pennsylvania
5 (20 reviews)
Verified
Residential Commercial

6+

Years in Business

0

20

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
100%
Certifications
75%
Experience
70%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Connected Energy Solar

Connected Energy Solar is a high-touch, owner-operated solar company founded by Dunnegan McKay in 2020 in Pittsburgh, Pennsylvania. Headquartered at 2405 McNeilly Road, Suite A, the company has built a strong reputation in the Pittsburgh market for honest, personalized customer service and quality installations. Connected Energy Solar is ranked among the top five solar installers in Pittsburgh by the EnergySage Marketplace.

The company provides full turnkey solar energy system installation for both residential and commercial clients. All work is performed by NABCEP-certified technicians, and the team carefully selects solar panels, inverters, and mounting systems from leading manufacturers. Connected Energy’s installations incorporate smart monitoring systems that allow homeowners to track energy production and consumption in real time.

Connected Energy Solar is BBB-accredited with a 5.0-star rating across review platforms. The company also assists clients with financing options for their solar installations. Customers consistently praise the personal, no-pressure approach and the quality of workmanship that sets Connected Energy apart from larger corporate installers in the region.

Service Area

Connected Energy Solar serves the following areas within a 62-mile radius:

PittsburghMt. LebanonUpper St. ClairBethel ParkSouth HillsCastle Shannon

Are you Connected Energy Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Maintenance
Monitoring

Certifications & Accreditations

NABCEP BBB Accredited

Partner Manufacturers

Panels

Tier-1 Monocrystalline

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

20 reviews

Patricia G.

1 September 2025
Verified Customer

Dunnegan took the time to explain every detail of our solar system. No high-pressure sales tactics, just honest guidance on what would work best for our home. The installation was seamless.

Robert K.

28 June 2025
Verified Customer

Connected Energy Solar made going solar simple. They handled everything from design to permitting to installation. Our system has been producing more than estimated since day one.

Sandra L.

15 April 2025
Verified Customer

We chose Connected Energy because of their personal approach. Dunnegan was always available to answer questions and the NABCEP-certified crew did excellent work. Highly recommend.

Frequently Asked Questions About Connected Energy Solar

What services does Connected Energy Solar offer?

Connected Energy Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.

Is Connected Energy Solar NABCEP certified?

Yes, Connected Energy Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Connected Energy Solar serve?

Connected Energy Solar serves Pittsburgh, Mt. Lebanon, Upper St. Clair, Bethel Park, South Hills, Castle Shannon. They are based in Pittsburgh with a service radius of 100 km.

What warranty does Connected Energy Solar offer?

Connected Energy Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Connected Energy Solar's customer reviews?

Connected Energy Solar has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Connected Energy Solar been in business?

Connected Energy Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Connected Energy Solar

Fill in your details and we'll connect you with Connected Energy Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote