Solar Installers in Pittsburgh, Pennsylvania

10 Companies 229 Reviews 4.6 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Pittsburgh

Ranked by rating and customer reviews

CE
1

Connected Energy Solar

Verified
5.0 (20 reviews)
Est. 2020 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

NABCEP · BBB Accredited

Tier-1 Monocrystalline + Enphase

E
2

Envinity

Verified
5.0 (10 reviews)
Est. 2005 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

NABCEP

American-Made Solar Panels + Enphase

GR
3

Green Rack Solar

Verified
4.9 (50 reviews)
Est. 2019 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

Tesla Powerwall Certified · Enphase Platinum · Q.CELLS Q.Partner · REC ProTrust

Q.CELLS + Enphase

BS
4

Bluebird Sky Solar

Verified
4.7 (25 reviews)
Est. 2021 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

BBB Accredited

Tier-1 Monocrystalline + Enphase

EI
5

Energy Independent Solutions

Verified
4.6 (26 reviews)
Est. 2008 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryMaintenanceMonitoring

NABCEP · BBB Accredited

Monocrystalline Tier-1 + Enphase

EE
6

Ethical Energy Solar

Verified
4.5 (30 reviews)
Est. 2020 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

NABCEP

US-Made Solar Panels + Enphase

PS
7

Pittsburgh Solar

4.5 (10 reviews)
Est. 2020 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignGrid Connection

Tier-1 Solar Panels + String Inverters

P
8

PozitivEnergy

4.5 (8 reviews)
Est. 2020 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

Tier-1 Solar Panels + Microinverters

GS
9

Green Solar Systems

Verified
4.2 (20 reviews)
Est. 2011 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignEnergy Audit

NABCEP · BBB Accredited · PA Home Improvement Contractor · City of Pittsburgh Master Electrician

Tier-1 Monocrystalline + Enphase

SS
10

Scalo Solar Solutions

Verified
4.2 (30 reviews)
Est. 2010 · Pittsburgh, Pennsylvania · 25yr warranty
SolarBatteryDesignRoof Assessment

NABCEP PV Associate · BBB Accredited

Jinko Solar + Enphase

What Solar Costs in Pittsburgh

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

229

Customer Reviews

Solar Installation in Pittsburgh, Pennsylvania

Pittsburgh homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Pittsburgh

Start by checking NABCEP certification and Pennsylvania state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Pittsburgh.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Pennsylvania

Find solar installers in other Pennsylvania cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Pittsburgh?

Solar panel costs in Pittsburgh typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Pennsylvania state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Pittsburgh?

The best solar installer in Pittsburgh depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Pittsburgh?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Pennsylvania may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility — check with your local utility in Pittsburgh to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Pittsburgh?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Pittsburgh?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free