Core7
NICEIC and MCS certified solar, battery storage, and EV charger installers based in Swindon, Wiltshire
2026+
Years in Business
66
Customer Reviews
50 km
Service Area
1-10
Employees
SurgePV Score
About Core7
Core7 is an electrical contracting, solar, and renewable energy company based in Swindon, Wiltshire. The company holds NICEIC Approved Contractor status, MCS and RECC registration, SafeContractor accreditation, and is a Tesla Powerwall accredited installer. All work is insured to £10 million and is Part P approved.
Core7 serves residential, commercial, and utility-scale solar projects across Swindon and the surrounding South West region. Services include solar panel installation, battery storage systems (including Tesla Powerwall), and EV charging infrastructure. The company also has a dedicated commercial and utility solar division covering larger-scale projects in Swindon and the wider South West.
Core7 is listed on Renewables Excellence as a verified installer in Swindon, and can be contacted by phone on 01793 326464 or via core7.co.uk. All installations come with a 12-month workmanship guarantee.
Service Area
Core7 serves the following areas within a 50 km radius:
Contact Information
Are you Core7?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Core7
What services does Core7 offer?
Core7 offers Solar Installation, Battery Storage, EV Charging.
Is Core7 MCS certified?
Yes, Core7 is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Core7 serve?
Core7 serves Swindon, Wiltshire, Bristol, Bath, Chippenham, Cirencester. They are based in Swindon with a service radius of 50 km.
What warranty does Core7 offer?
Core7 offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Core7's customer reviews?
Core7 has a 4.8/5 rating based on 66 customer reviews. Customers consistently rate them highly.
How long has Core7 been in business?
Core7 was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Swindon
Get a Free Solar Quote from Core7
Fill in your details and we'll connect you with Core7.
Quote request sent!
Core7 will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile