WE

Wiltshire Energy

MCS accredited solar PV, heat pump, battery storage, and EV charging specialists based in Royal Wootton Bassett since 2016

Swindon, UK
5 (2 reviews)
Verified
Residential Commercial

10+

Years in Business

0

2

Customer Reviews

50 km

Service Area

1-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
100%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Wiltshire Energy

Wiltshire Energy Ltd is based at Unit 12 Templars Way Industrial Estate, Marlborough Road, Royal Wootton Bassett, Swindon, SN4 7SR. The company was founded in 2016 as a locally based, family business committed to advancing low-carbon energy solutions for homes and businesses across Wiltshire and the surrounding area.

Wiltshire Energy holds MCS accreditation and is TrustMark registered. The company provides solar PV systems, battery storage, air source heat pumps, ground source heat pumps, solar thermal, and EV charging. This breadth of renewable energy services makes Wiltshire Energy a single-installer solution for households looking to reduce their reliance on grid electricity.

The company is contactable at 0333 5776065 and serves Swindon, Royal Wootton Bassett, Chippenham, Marlborough, Devizes, and Cirencester. Wiltshire Energy is also listed on the Renewable Energy Hub and Sunamp UK’s approved reseller network.

Service Area

Wiltshire Energy serves the following areas within a 50 km radius:

SwindonRoyal Wootton BassettChippenhamMarlboroughDevizesCirencester

Are you Wiltshire Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS TrustMark

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Wiltshire Energy

What services does Wiltshire Energy offer?

Wiltshire Energy offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Wiltshire Energy MCS certified?

Yes, Wiltshire Energy is MCS certified and also holds TrustMark certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Wiltshire Energy serve?

Wiltshire Energy serves Swindon, Royal Wootton Bassett, Chippenham, Marlborough, Devizes, Cirencester. They are based in Swindon with a service radius of 50 km.

What warranty does Wiltshire Energy offer?

Wiltshire Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Wiltshire Energy's customer reviews?

Wiltshire Energy has a 5/5 rating based on 2 customer reviews. Customers consistently rate them highly.

How long has Wiltshire Energy been in business?

Wiltshire Energy was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Wiltshire Energy

Fill in your details and we'll connect you with Wiltshire Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote