CE

CS Electrical Contracting (UK)

NICEIC and MCS registered solar panel and electrical specialists based in Swindon, Wiltshire

Swindon, UK
0 (0 reviews)
Verified
Residential Commercial Industrial

2026+

Years in Business

0

40 km

Service Area

1-10

Employees

SurgePV Score

5.5 / 10
Customer Reviews
0%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About CS Electrical Contracting (UK)

CS Electrical Contracting (UK) Ltd is based at 6 Leamington Grove, Swindon, Wiltshire, SN3 1NU. The company covers domestic, commercial, and industrial electrical work and solar panel installation across Swindon and surrounding Wiltshire areas including Cirencester and Marlborough.

The company holds NICEIC registration and MCS certification, with all contractors DBS-checked. Solar services include full-project solar panel supply and installation from initial consultation and system design through to commissioning and ongoing maintenance. A 2-year workmanship warranty is included on all installations.

CS Electrical Contracting is listed on ENF Solar’s UK installer directory and the Renewable Energy Hub as a solar PV installer operating in the Swindon and Wiltshire area. The company can be found via their website at cs-elec.co.uk.

Service Area

CS Electrical Contracting (UK) serves the following areas within a 40 km radius:

SwindonCirencesterMarlboroughWiltshire

Contact Information

Are you CS Electrical Contracting (UK)?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NICEIC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About CS Electrical Contracting (UK)

What services does CS Electrical Contracting (UK) offer?

CS Electrical Contracting (UK) offers Solar Installation, Battery Storage, Maintenance.

Is CS Electrical Contracting (UK) MCS certified?

Yes, CS Electrical Contracting (UK) is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does CS Electrical Contracting (UK) serve?

CS Electrical Contracting (UK) serves Swindon, Cirencester, Marlborough, Wiltshire. They are based in Swindon with a service radius of 40 km.

What warranty does CS Electrical Contracting (UK) offer?

CS Electrical Contracting (UK) offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are CS Electrical Contracting (UK)'s customer reviews?

CS Electrical Contracting (UK) does not have any reviews yet. Be the first to leave a review after using their services.

How long has CS Electrical Contracting (UK) been in business?

CS Electrical Contracting (UK) was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from CS Electrical Contracting (UK)

Fill in your details and we'll connect you with CS Electrical Contracting (UK).

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote