CS

CST Solar (Consolidated Solar Technologies)

SunPower Elite Dealer in Santa Fe specializing in high-efficiency residential solar since 2008

Santa Fe, New Mexico
4.5 (5 reviews)
Verified
Residential Commercial

18+

Years in Business

0

5

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
90%
Certifications
60%
Experience
100%
Services Range
60%
Warranty Coverage
87%
Online Presence
75%

About CST Solar (Consolidated Solar Technologies)

CST Solar, formally Consolidated Solar Technologies, is a Santa Fe-based solar installation company located at 1310 Monterey Drive, Santa Fe, NM 87505. Founded in 2008, CST Solar is a SunPower Elite Dealer, offering high-efficiency SunPower photovoltaic systems for residential and commercial customers.

SunPower panels installed by CST Solar generate up to 70 percent more energy than competing panels over 25 years and carry an industry-leading 25-year product and performance warranty. CST Solar backs installations with a 15-year workmanship warranty. Electrical engineering, design, and grid interconnection are performed by their sister company, Mosher Enterprises, a New Mexico-based design-build electrical contractor.

CST Solar serves Santa Fe, Albuquerque, Los Alamos, and surrounding communities in northern New Mexico.

Service Area

CST Solar (Consolidated Solar Technologies) serves the following areas within a 50-mile radius:

Santa FeAlbuquerqueLos Alamos

Are you CST Solar (Consolidated Solar Technologies)?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Certifications & Accreditations

SunPower Elite Dealer

Partner Manufacturers

Panels

SunPower

Inverters

SunPower

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

15 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

5 reviews

Verified Customer

20 August 2025
Verified Customer

CST Solar installed SunPower panels on our Santa Fe home. The team was knowledgeable about the product and handled all permitting. The panels are generating more energy than we expected.

Verified Customer

14 May 2025
Verified Customer

Solid installation and good communication throughout the process. As a SunPower Elite dealer, they offered panels with excellent efficiency ratings and a strong warranty.

Verified Customer

10 February 2025
Verified Customer

Professional team from start to finish. The electrical work was done by their sister company Mosher Enterprises, and everything passed inspection on the first try.

Frequently Asked Questions About CST Solar (Consolidated Solar Technologies)

What services does CST Solar (Consolidated Solar Technologies) offer?

CST Solar (Consolidated Solar Technologies) offers Solar Installation, Maintenance.

Is CST Solar (Consolidated Solar Technologies) NABCEP certified?

CST Solar (Consolidated Solar Technologies) holds the following certifications: SunPower Elite Dealer. Contact them directly for the latest accreditation details.

What areas does CST Solar (Consolidated Solar Technologies) serve?

CST Solar (Consolidated Solar Technologies) serves Santa Fe, Albuquerque, Los Alamos. They are based in Santa Fe with a service radius of 80 km.

What warranty does CST Solar (Consolidated Solar Technologies) offer?

CST Solar (Consolidated Solar Technologies) offers 25-year panel warranty, 25-year inverter warranty, and 15-year installation/workmanship warranty.

How are CST Solar (Consolidated Solar Technologies)'s customer reviews?

CST Solar (Consolidated Solar Technologies) has a 4.5/5 rating based on 5 customer reviews. Customers consistently rate them highly.

How long has CST Solar (Consolidated Solar Technologies) been in business?

CST Solar (Consolidated Solar Technologies) was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from CST Solar (Consolidated Solar Technologies)

Fill in your details and we'll connect you with CST Solar (Consolidated Solar Technologies).

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote