Positive Energy Solar
Employee-owned B-Corp solar installer with over 5,000 installations across New Mexico since 1997
29+
Years in Business
5,000+
Projects Completed
300
Customer Reviews
93 mi
Service Area
101-200
Employees
SurgePV Score
About Positive Energy Solar
Positive Energy Solar is an employee-owned solar company founded in 1997 by Allan Sindelar in Santa Fe, New Mexico. With offices in both Albuquerque and Santa Fe, the company has grown to over 120 employees, including more than 75 employee-owners, and has completed over 5,000 solar installations across the state. Positive Energy Solar is a certified B-Corp and one of the longest-operating solar companies in New Mexico.
The company is a SunPower Master Dealer and employs multiple NABCEP-certified professionals across its design, sales, and installation teams. Positive Energy handles residential and commercial solar projects, battery storage installations, and EV charger setups. Their in-house service team provides ongoing maintenance and monitoring support for existing solar systems, making them a full-lifecycle solar partner for New Mexico homeowners and businesses.
Positive Energy Solar holds a 4.9-star rating from over 300 reviews across platforms, with customers praising the consultative sales process and technical expertise. The company has won multiple industry awards and is regularly recognized as one of the top solar employers in the Southwest. Their 25-year panel and inverter warranties, combined with a 10-year workmanship guarantee, reflect their commitment to long-term system performance.
Service Area
Positive Energy Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Positive Energy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
300 reviews
Sarah T.
Positive Energy handled our 8 kW residential system from start to finish. Their NABCEP-certified team designed a layout that maximizes afternoon production on our flat roof. System has been running flawlessly for six months.
James W.
As a commercial property owner, I appreciated their thoroughness in the engineering phase. The 50 kW system they installed on our warehouse is producing 5% above projections. Great communication throughout the three-month project.
Maria G.
Professional team and quality equipment. The SunPower panels look great and perform well. Only minor issue was a two-week permitting delay, but Positive Energy kept us updated at every step.
Frequently Asked Questions About Positive Energy Solar
What services does Positive Energy Solar offer?
Positive Energy Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Commercial Solar, Energy Audit.
Is Positive Energy Solar NABCEP certified?
Yes, Positive Energy Solar is NABCEP certified and also holds B-Corp Certified, SunPower Master Dealer certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Positive Energy Solar serve?
Positive Energy Solar serves Albuquerque, Santa Fe, Rio Rancho, Corrales, Los Lunas, Tijeras, Edgewood, Placitas and 1 other areas. They are based in Albuquerque with a service radius of 150 km.
What warranty does Positive Energy Solar offer?
Positive Energy Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Positive Energy Solar's customer reviews?
Positive Energy Solar has a 4.9/5 rating based on 300 customer reviews. Customers consistently rate them highly.
How long has Positive Energy Solar been in business?
Positive Energy Solar was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.
Similar Installers in Albuquerque
Get a Free Solar Quote from Positive Energy Solar
Fill in your details and we'll connect you with Positive Energy Solar.
Quote request sent!
Positive Energy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile