CS

Cymru Solar

MCS-accredited Welsh solar specialists with a 4.6-star rating, serving homes, businesses and schools across South Wales

Cardiff, UK
4.6 (27 reviews)
Verified
Residential Commercial

11+

Years in Business

27

Customer Reviews

60 km

Service Area

2-10

Employees

SurgePV Score

8.1 / 10
Customer Reviews
92%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
70%
Online Presence
50%

About Cymru Solar

Cymru Solar is a Welsh solar panel installation company based at Ty Merlin, Caerphilly Business Park, Caerphilly CF83 3GS, serving the whole of South Wales including Cardiff, Newport, Swansea and Bridgend. The company specialises in the design, installation and maintenance of solar photovoltaic systems for a wide range of clients including residential homes, businesses, schools, farms and government buildings.

The company is MCS accredited and registered with the NICEIC Micro-generation scheme, and holds membership with the REA consumer code. Cymru Solar works with multiple battery storage manufacturers including Tesla, GivEnergy, Huawei, SolarEdge and Growatt, giving customers a range of options to suit their energy needs and budgets. All installations carry a full 10-year insurance-backed workmanship warranty.

On Birdeye and Google, Cymru Solar holds a 4.6-star rating from 27 reviews. Customers consistently highlight competitive pricing, fast turnaround times and responsive communication. The company is known for providing detailed quotations without pressure sales tactics, and their installation teams receive regular praise for punctuality and clean workmanship.

Service Area

Cymru Solar serves the following areas within a 60 km radius:

CardiffCaerphillyNewportSwanseaBridgendPontypridd

Are you Cymru Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS NICEIC

Partner Manufacturers

Batteries

TeslaGivEnergyHuaweiSolarEdgeGrowatt

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.6

27 reviews

Verified Customer

10 September 2025
Verified Customer

Communication was great and questions were answered instantly. I got numerous quotes and theirs was the best in both price and spec of equipment. From signing the contract the system was installed in 8 days.

Verified Customer

5 July 2025
Verified Customer

Cymru Solar were professional from start to finish. The installation team arrived on time and completed the work to a high standard with minimal disruption.

Verified Customer

18 April 2025
Verified Customer

Competitive pricing combined with exceptional customer service. The team explained everything clearly and the installation was completed faster than expected.

Frequently Asked Questions About Cymru Solar

What services does Cymru Solar offer?

Cymru Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Cymru Solar MCS certified?

Yes, Cymru Solar is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Cymru Solar serve?

Cymru Solar serves Cardiff, Caerphilly, Newport, Swansea, Bridgend, Pontypridd. They are based in Cardiff with a service radius of 60 km.

What warranty does Cymru Solar offer?

Cymru Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Cymru Solar's customer reviews?

Cymru Solar has a 4.6/5 rating based on 27 customer reviews. Customers consistently rate them highly.

How long has Cymru Solar been in business?

Cymru Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Cymru Solar

Fill in your details and we'll connect you with Cymru Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote