DP

Daniels Plumbing, Heating and Air Conditioning

Full-service HVAC and solar installation contractor on Cerrillos Road in Santa Fe

Santa Fe, New Mexico
4.6 (10 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
92%
Certifications
60%
Experience
100%
Services Range
60%
Warranty Coverage
80%
Online Presence
75%

About Daniels Plumbing, Heating and Air Conditioning

Daniels Plumbing, Heating and Air Conditioning is a full-service contractor located at 1536 Cerrillos Road, Santa Fe, NM. The company provides HVAC, plumbing, and solar panel installation services for residential and commercial properties.

As a top-rated contractor for solar installation in Santa Fe, Daniels offers integrated energy solutions that combine solar panel systems with HVAC and plumbing services. This allows homeowners to address multiple home energy needs with a single licensed contractor.

Daniels serves the Santa Fe and Albuquerque areas and maintains a strong reputation for reliable workmanship and responsive customer service.

Service Area

Daniels Plumbing, Heating and Air Conditioning serves the following areas within a 50-mile radius:

Santa FeAlbuquerque

Are you Daniels Plumbing, Heating and Air Conditioning?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Certifications & Accreditations

Licensed Contractor (NM)

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

10 reviews

Verified Customer

18 July 2025
Verified Customer

Daniels handled both our HVAC upgrade and solar panel installation in one project. Having a single contractor manage both saved time and ensured the electrical work was coordinated properly.

Verified Customer

25 April 2025
Verified Customer

Professional installation and good communication. They were responsive when we had questions about our system performance after installation.

Verified Customer

30 January 2025
Verified Customer

Reliable contractor with a strong local reputation. The solar installation was clean and completed on schedule. Happy with the results so far.

Frequently Asked Questions About Daniels Plumbing, Heating and Air Conditioning

What services does Daniels Plumbing, Heating and Air Conditioning offer?

Daniels Plumbing, Heating and Air Conditioning offers Solar Installation, Maintenance.

Is Daniels Plumbing, Heating and Air Conditioning NABCEP certified?

Daniels Plumbing, Heating and Air Conditioning holds the following certifications: Licensed Contractor (NM). Contact them directly for the latest accreditation details.

What areas does Daniels Plumbing, Heating and Air Conditioning serve?

Daniels Plumbing, Heating and Air Conditioning serves Santa Fe, Albuquerque. They are based in Santa Fe with a service radius of 80 km.

What warranty does Daniels Plumbing, Heating and Air Conditioning offer?

Daniels Plumbing, Heating and Air Conditioning offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Daniels Plumbing, Heating and Air Conditioning's customer reviews?

Daniels Plumbing, Heating and Air Conditioning has a 4.6/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Daniels Plumbing, Heating and Air Conditioning been in business?

Daniels Plumbing, Heating and Air Conditioning was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Daniels Plumbing, Heating and Air Conditioning

Fill in your details and we'll connect you with Daniels Plumbing, Heating and Air Conditioning.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote