Detail Solar
NABCEP-certified family-owned Greenville solar installer converting Upstate homes for over a decade
12+
Years in Business
20
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Detail Solar
Detail Solar is a locally owned, family-run solar installation company headquartered at 130 Honeysuckle Drive, Greenville, SC 29609. Founded around 2014, the company was the second solar installer to earn NABCEP certification in South Carolina, and all technicians hold certifications from SolarEdge, Generac, and Enphase.
Detail Solar provides residential and commercial solar panel installation, battery storage, and maintenance services throughout the Greenville and Upstate South Carolina region. The company works exclusively with leading manufacturers and handles the full process from system design through permitting and inspection.
Detail Solar has built a strong reputation in the Upstate over the past decade, with customers praising the company’s technical expertise and personal service approach.
Service Area
Detail Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Detail Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
20 reviews
Verified Customer
Detail Solar was the second NABCEP-certified installer in South Carolina and their expertise shows. The design was thoughtful, the installation was clean, and the system is performing above projections.
Verified Customer
Great local company. Being family-owned, they treated us like family. The installation team was professional and the system has been working perfectly since day one.
Verified Customer
Highly recommend Detail Solar. They handled everything from design to permitting and the installation was completed ahead of schedule. Excellent communication throughout.
Frequently Asked Questions About Detail Solar
What services does Detail Solar offer?
Detail Solar offers Solar Installation, Battery Storage, Maintenance.
Is Detail Solar NABCEP certified?
Detail Solar holds the following certifications: NABCEP Certified, SolarEdge Certified, Enphase Certified, Generac Certified. Contact them directly for the latest accreditation details.
What areas does Detail Solar serve?
Detail Solar serves Greenville, Spartanburg, Anderson, Easley, Simpsonville, Greer. They are based in Greenville with a service radius of 80 km.
What warranty does Detail Solar offer?
Detail Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Detail Solar's customer reviews?
Detail Solar has a 4.9/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Detail Solar been in business?
Detail Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Greenville
Get a Free Solar Quote from Detail Solar
Fill in your details and we'll connect you with Detail Solar.
Quote request sent!
Detail Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile