DS

Drews Solar

Locally owned and family-run solar installer crafting high-quality residential arrays in south-central Wisconsin since 2016

Madison, Wisconsin
5 (25 reviews)
Residential

10+

Years in Business

400+

Projects Completed

25

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

6.7 / 10
Customer Reviews
100%
Certifications
0%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Drews Solar

Drews Solar is a locally owned and family-run solar installation company based at 533 Spruce Street in Madison, Wisconsin. Founded in 2016 by Mike Drews, who relocated from California to Wisconsin to start the company, Drews Solar has served over 400 families in south-central Wisconsin.

Michael oversees site visits, system design, and installations personally, while Maria ensures smooth communication and support throughout every project. The company holds a perfect 5.0-star rating, making it the highest-rated solar installer in the Madison market.

Drews Solar specializes in residential solar installations in Dane County and surrounding areas, including Middleton, Sun Prairie, Fitchburg, Verona, and Oregon. The company operates Monday through Friday from 8:00 AM to 5:00 PM.

Service Area

Drews Solar serves the following areas within a 50-mile radius:

MadisonMiddletonSun PrairieFitchburgVeronaOregon

Are you Drews Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Monitoring

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

25 reviews

Eric M.

30 August 2025
Verified Customer

Drews Solar provided outstanding personal service. Mike and Maria were great communicators throughout the process and the installation quality is top-notch.

Susan T.

22 May 2025
Verified Customer

As a small, family-run company, Drews Solar delivers the personal attention that larger companies can't match. Our system was designed and installed perfectly.

John R.

10 February 2025
Verified Customer

Michael oversaw every aspect of our installation personally. The workmanship is excellent and the system has been performing above expectations.

Frequently Asked Questions About Drews Solar

What services does Drews Solar offer?

Drews Solar offers Solar Installation, Solar Design, Monitoring.

Is Drews Solar NABCEP certified?

Drews Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Drews Solar serve?

Drews Solar serves Madison, Middleton, Sun Prairie, Fitchburg, Verona, Oregon. They are based in Madison with a service radius of 80 km.

What warranty does Drews Solar offer?

Drews Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Drews Solar's customer reviews?

Drews Solar has a 5/5 rating based on 25 customer reviews. Customers consistently rate them highly.

How long has Drews Solar been in business?

Drews Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Drews Solar

Fill in your details and we'll connect you with Drews Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote