ES

Elevated Solar and Electric

Locally owned Southeastern Wisconsin solar and electrical installer with top-rated BBB reviews

Milwaukee, Wisconsin
5 (18 reviews)
Verified
Residential Commercial

5+

Years in Business

200+

Projects Completed

18

Customer Reviews

37 mi

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
100%
Certifications
75%
Experience
70%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Elevated Solar and Electric

Elevated Solar and Electric is a locally owned and operated solar energy company based in Brookfield, Wisconsin, serving the greater Southeastern Wisconsin area. Founded in 2021 by Ross Schultz and Brandon, the company combines over a decade of combined experience in renewable energy with a focus on personalized customer service. Elevated Solar provides solar panel installation, battery storage, EV charging, generator installation, and general electrical services.

The company’s owner-operated model means homeowners work directly with the principals throughout their project, from initial consultation through system activation. Elevated Solar and Electric holds an electrical contractor license and is BBB accredited. They source and install solar panels, inverters, batteries, and EV chargers, and can handle any necessary electrical upgrades as part of a solar installation project.

Elevated Solar and Electric maintains a perfect 5-star rating on BBB and Birdeye, with customers consistently praising the personalized attention, honest pricing, and quality craftsmanship. Their BuildZoom score of 108 places them above 95% of contractors in Wisconsin. The company operates from Brookfield and serves Milwaukee and Waukesha counties, including communities such as Wauwatosa, New Berlin, Elm Grove, Menomonee Falls, and Pewaukee.

Service Area

Elevated Solar and Electric serves the following areas within a 37-mile radius:

MilwaukeeBrookfieldWaukeshaNew BerlinWauwatosaWest AllisElm GroveMenomonee FallsPewaukeeOconomowoc

Are you Elevated Solar and Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
EV Charging
electrical_services
generators

Certifications & Accreditations

BBB Accredited Licensed Electrical Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

18 reviews

Matt S.

5 September 2025
Verified Customer

Ross and Brandon at Elevated Solar did an outstanding job on our system. As a smaller local company, they provided personalized attention you do not get from the big national installers. The installation was clean and our production has been above projections.

Kelly N.

28 April 2025
Verified Customer

We appreciated working directly with the owners of the company. They were transparent about pricing, realistic about production estimates, and the installation was done professionally. Our 8 kW system has cut our electric bill significantly.

Ryan G.

15 December 2024
Verified Customer

Elevated Solar installed solar panels and an EV charger at our Brookfield home. Having one company do both saved us time and money. The crew was respectful, efficient, and left our property spotless. Great local company.

Frequently Asked Questions About Elevated Solar and Electric

What services does Elevated Solar and Electric offer?

Elevated Solar and Electric offers Solar Installation, Battery Storage, Solar Design, EV Charging, electrical_services, generators.

Is Elevated Solar and Electric NABCEP certified?

Elevated Solar and Electric holds the following certifications: BBB Accredited, Licensed Electrical Contractor. Contact them directly for the latest accreditation details.

What areas does Elevated Solar and Electric serve?

Elevated Solar and Electric serves Milwaukee, Brookfield, Waukesha, New Berlin, Wauwatosa, West Allis, Elm Grove, Menomonee Falls and 2 other areas. They are based in Milwaukee with a service radius of 60 km.

What warranty does Elevated Solar and Electric offer?

Elevated Solar and Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Elevated Solar and Electric's customer reviews?

Elevated Solar and Electric has a 5/5 rating based on 18 customer reviews. Customers consistently rate them highly.

How long has Elevated Solar and Electric been in business?

Elevated Solar and Electric was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Elevated Solar and Electric

Fill in your details and we'll connect you with Elevated Solar and Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote