EN

Eco NRG Ltd

Award-winning MCS certified solar, heat pump and battery storage specialists serving Plymouth and Devon since 2010

Plymouth, UK
4 (33 reviews)
Verified
Residential Commercial

16+

Years in Business

1,000+

Projects Completed

33

Customer Reviews

50 km

Service Area

11-50

Employees

SurgePV Score

7.5 / 10
Customer Reviews
80%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Eco NRG Ltd

Eco NRG Ltd is an award-winning renewable energy company based at Unit 10C, New Mills Industrial Estate, Modbury, Devon, PL21 0TP, near Plymouth. The company was incorporated on 31 December 2009 and has been designing and installing bespoke renewable energy systems across Devon and the South West since 2010. They can be reached on 01548 831890.

The company is fully MCS accredited and is a SunPower Premier Partner — a recognition awarded by the manufacturer of some of the most efficient solar panels available. This partnership reflects Eco NRG’s track record in delivering high-quality installations that meet manufacturer performance standards. Over the past 15 years the company has completed over 1,000 installations of solar PV panels, air source heat pumps, EV chargers, and battery storage systems.

Eco NRG offers a comprehensive range of renewable technologies, making it well suited to customers who want to combine solar generation with battery storage and electric vehicle charging in a single managed project. The company’s engineers design each system individually to match the specific energy needs of the property.

The business has a 4-star rating on Trustpilot from 8 reviews and 33 reviews on Birdeye. Customer feedback highlights the team’s professionalism and technical competence, including cases where Eco NRG successfully resolved problems created by previous installers. Their base in Modbury gives them strong coverage across the South Hams area and the wider Plymouth catchment.

Service Area

Eco NRG Ltd serves the following areas within a 50 km radius:

PlymouthModburyIvybridgeDevonSouth Hams

Are you Eco NRG Ltd?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Partner Manufacturers

Panels

SunPower

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4

33 reviews

Verified Customer

1 September 2025
Verified Customer

Excellent service — fitters were polite and very professional. Eco NRG stepped in and sorted out a problem caused by a previous engineer, which I really appreciated.

Verified Customer

22 April 2025
Verified Customer

Eco NRG has been outstanding from the initial consultation through to installation. Their knowledge of solar and battery systems is exceptional and the whole process was hassle-free.

Frequently Asked Questions About Eco NRG Ltd

What services does Eco NRG Ltd offer?

Eco NRG Ltd offers Solar Installation, Battery Storage, EV Charging.

Is Eco NRG Ltd MCS certified?

Yes, Eco NRG Ltd is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Eco NRG Ltd serve?

Eco NRG Ltd serves Plymouth, Modbury, Ivybridge, Devon, South Hams. They are based in Plymouth with a service radius of 50 km.

What warranty does Eco NRG Ltd offer?

Eco NRG Ltd offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Eco NRG Ltd's customer reviews?

Eco NRG Ltd has a 4/5 rating based on 33 customer reviews. They are well-regarded by their customers.

How long has Eco NRG Ltd been in business?

Eco NRG Ltd was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Eco NRG Ltd

Fill in your details and we'll connect you with Eco NRG Ltd.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote